My WebLink
|
Help
|
About
|
Sign Out
Home
Search
05/11/2022 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2022
>
05/11/2022 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2022 11:59:22 AM
Creation date
5/6/2022 3:01:51 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Minutes
Meeting Date
05/11/2022
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Katie Larsen <br />5/4/2022 <br />Page 2 <br />• Grading & Stormwater Management <br />The Otter Lake Animal Care Center will require site grading for the proposed building <br />expansion, the proposed pond adjustments, and the proposed parking lot. <br />The proposed project is within the Rice Creek Watershed District (RCWD). Stormwater <br />BMPs are needed to meet City stormwater requirements. The applicant is proposing to meet <br />City stormwater requirements by utilizing a pond previously constructed. The design of the <br />ponds shall meet the requirements of Table 6 of the City's Stormwater Management <br />ordinance. <br />Comments: <br />1. (8/7/2019) Revise the grading plan to eliminate the encroachment onto the <br />property to the north. <br />Response: We cannot remove grading to the north as the basin needs to be <br />dredged to reach its full storage and a new skimmer structure needs to be <br />constructed on the outlet, which is on the north property. An agreement will have <br />to be drafted. <br />(5/4/2022) Noted, provide final agreement when ready <br />2. (81V2019) Revise the grarlin.. plan +e eliminate the eni <br />property to the east <br />Deese: Grading to the oast has hoer, r red <br />3. (81712019) Provide details OR the utility plan fer replanc <br />sferm seWeF alep.. Otter Lake Dead <br />RespeRse: The replaGemen+.,fthe 15" GSAD is shewR <br />4. (817 2019) Provide rip p .dead fer Dain r'_„arrliap d*,;( <br />RC.S'peR68 Ripp a,pp detail ics shOWRr"vrprEAeetGR- i <br />5. (4/7/2019) PFe-yi.te Qr.Jinary High Water Level vel fer POR <br />Response: The.fL is s#oWR GRrsheet Q 1 <br />6. (81V2019) Provide Ordinary High Water Level, ,el NWIL a <br />area ep +he south site of the p ei4y <br />Response: The nHWIL, NWIL and HWL a shown on. <br />7. (81712019) Provide Ernergenr erfle,., (EGG) elevati <br />pd dra <br />Ruse: The C(1C v.fi+h drainag arrows is sh.,WR O <br />8 Drekgi.te a alvsis of the snev,melt e <br />• Le7r/fr7�Z[•l��/17Lt(I17T7RT:nl.IR�.I/�IGS�GT�t�1:P.ET.EL1 <br />- ffic.. <br />2 =e--e <br />•�� 1 <br />Otter Lake Animal Care Center Engineering Review <br />
The URL can be used to link to this page
Your browser does not support the video tag.