Laserfiche WebLink
Mr. Justin Williams <br />April 14, 2022 <br />Page 3 <br />h) Review site and prepare punch lists. <br />Post Construction Services (2-Year Warranty Inspection) <br />a) The work will be specified with a standard 2-year warranty. It is critical to inspect <br />a water tower just prior to the end of the 2-year warranty period because coatings <br />that fail within 2-years will likely continue to fail after the warranty expires. A <br />certified NACE inspector will conduct the warranty inspection to identify defects <br />with the interior wet coatings. The interior dry and exterior coatings will also be <br />inspected. An inspection report will be prepared, and the Contractor will be <br />notified to repair any defects that are identified during the 2-year warranty <br />inspection. Post construction inspection services for repair work are not included <br />in this proposal but can be provided for additional fees if the Contractor is <br />required to make warranty repairs if requested by the City. <br />Schedule <br />We will begin the construction phase services immediately after authorization. The <br />proposed schedule includes the following milestone dates: <br />Task <br />Dates <br />Substantial Completion <br />August 15, 2022 <br />Final Completion <br />Sept mber 12, 2022 <br />Post Construction (Warranty Inspection) <br />August 15, 2024 <br />Estimated Fees <br />WSB and KLM will complete the proposed design and bidding services for an hourly, <br />not -to -exceed cost of $127,544.00. We estimated the following fees for this project <br />based on a 12-week construction period. Actual charges will be based on the time <br />required for each task during the construction phase. Additional services, if requested <br />and approved by the City, will be invoiced on the basis of actual hours spent at current <br />billing rates. All services will be invoiced monthly. The following table and attached <br />spreadsheet provide a breakdown of the estimated task hours and fees. <br />Task <br />WSB Fees <br />KLM Fees <br />Total Fees <br />I. Construction Phase Services <br />$20,453.00 <br />$102,798.00 <br />$123,251.00 <br />II. Post Construction Phase Services <br />$1,093.00 <br />$3,200.00 <br />$4,293.00 <br />Total Construction and Post Construction Services <br />$21,546.00 <br />$105,998.00 <br />$127,544.00 <br />This letter represents our understanding of the construction phase and post <br />construction phase services for the Water Tower No. 2 Rehabilitation project. If you <br />are in agreement with the scope of services and proposed fee, please sign in the <br />appropriate space below and return one copy to us. <br />