My WebLink
|
Help
|
About
|
Sign Out
Home
Search
05-09-2022 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2022
>
Searchable Packets
>
05-09-2022 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2022 5:53:38 PM
Creation date
5/9/2022 11:34:38 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
05/09/2022
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
wsb <br />April 14, 2022 <br />Mr. Justin Williams <br />Public Works Superintendent <br />City of Champlin <br />600 Town Center Pkwy <br />Lino Lakes, MN 55014-1182 <br />Re: Proposal for Construction Phase Services <br />Water Tower Rehabilitation No. 2 <br />City of Lino Lakes, MN <br />Dear Mr. Williams, <br />We appreciate the opportunity to submit this letter proposal to the City of Lino Lakes to <br />provide construction administration, full-time construction observation services, and <br />post construction services for the rehabilitation of the City's Water Tower No. 2 <br />Rehabilitation. WSB will provide all construction administration and KLM will work as a <br />subconsultant to WSB and provide the construction observation and a post construction <br />2-year warranty inspection of the tower. <br />Construction Services <br />We will provide the following construction phase services for this project: <br />a) Print and distribute construction contracts to Owner and Contractor. <br />b) Coordinate and attend a preconstruction meeting with the Contractor. <br />c) Provide full-time construction observation and determine if the work is <br />proceeding in general accordance with the Contract Documents and AWWA <br />standards. Inspection time includes full-time construction observation for a <br />duration of 12 weeks. The NACE certified inspector will primarily focus on areas <br />of abrasive blasting, surface preparation, and documentation of environmental <br />(temperature, relative humidity, etc.) to verify that adequate conditions are <br />present for work to proceed. <br />d) Provide daily construction administration and correspondence with the <br />Contractor. <br />e) Maintain job site files for shop drawings, correspondence, field inspection <br />reports, construction photographs, field orders, change orders, etc. <br />fl Review the Contractor's applications for payments with the Engineer. <br />g) Coordinate and manage on -site meetings with the City and the Contractor to <br />discuss progress. <br />
The URL can be used to link to this page
Your browser does not support the video tag.