Laserfiche WebLink
Mr. Justin Williams <br /> April 14, 2022 <br /> Page 3 <br /> h) Review site and prepare punch lists. <br /> Post Construction Services (2-Year Warranty Inspection) <br /> a) The work will be specified with a standard 2-year warranty. It is critical to inspect <br /> a water tower just prior to the end of the 2-year warranty period because coatings <br /> that fail within 2-years will likely continue to fail after the warranty expires. A <br /> certified NACE inspector will conduct the warranty inspection to identify defects <br /> with the interior wet coatings. The interior dry and exterior coatings will also be <br /> inspected. An inspection report will be prepared, and the Contractor will be <br /> notified to repair any defects that are identified during the 2-year warranty <br /> inspection. Post construction inspection services for repair work are not included <br /> in this proposal but can be provided for additional fees if the Contractor is <br /> required to make warranty repairs if requested by the City. <br /> Schedule <br /> We will begin the construction phase services immediately after authorization. The <br /> proposed schedule includes the following milestone dates: <br /> Task Dates <br /> Substantial Completion August 15, 2022 <br /> Final Completion September 12, 2022 <br /> Post Construction (Warranty Inspection) August 15, 2024 <br /> Estimated Fees <br /> WSB and KLM will complete the proposed design and bidding services for an hourly, <br /> not-to-exceed cost of$127,544.00. We estimated the following fees for this project <br /> based on a 12-week construction period. Actual charges will be based on the time <br /> required for each task during the construction phase. Additional services, if requested <br /> and approved by the City, will be invoiced on the basis of actual hours spent at current <br /> billing rates. All services will be invoiced monthly. The following table and attached <br /> spreadsheet provide a breakdown of the estimated task hours and fees. <br /> Task WSB Fees KLM Fees Total Fees <br /> I. Construction Phase Services $20,453.00 $102,798.00 $123,251.00 <br /> II. Post Construction Phase Services $1,093.00 $3,200.00 $4,293.00 <br /> Total Construction and Post Construction Services $21,546.00 $105,998.00 $127,544.00 <br /> This letter represents our understanding of the construction phase and post <br /> construction phase services for the Water Tower No. 2 Rehabilitation project. If you <br /> are in agreement with the scope of services and proposed fee, please sign in the <br /> appropriate space below and return one copy to us. <br />