My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08-01-2022 Council Work Session Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2022
>
Searchable Packets
>
08-01-2022 Council Work Session Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2022 7:05:31 PM
Creation date
8/3/2022 12:34:39 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
08/01/2022
Council Meeting Type
Work Session Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
831
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
aALLIANT ENVIRONMENTAL ASSESSMENT WORKSHEET 11 Robinson Sod Farm <br />d. Explain the project purpose; if the project will be carried out by a governmental unit, explain the need <br />for the project and identify its beneficiaries. <br />The purpose of the proposed project is to develop a residential neighborhood in the City of Lino <br />Lakes. Based on the City of Lino Lakes' 2040 Comprehensive Plan, the City has designated this area of <br />the community for future residential growth to meet the projected housing demands of current and <br />future residents. It is the intent of the developer to create a low density, medium, and high <br />residential neighborhood that contributes to the city's housing goals and objectives. <br />e. Are future stages of this development including development on any other property planned or likely <br />to happen? OYes ONo <br />If yes, briefly describe future stages, relationship to present project, timeline and plans for <br />environmental review. <br />There are no future stages of this development that are planned or likely to occur. <br />f. Is this project a subsequent stage of an earlier project? OYes xONo <br />If yes, briefly describe the past development, timeline and any past environmental review. <br />The project is not a subsequent stage of an earlier project. <br />7. Cover Types <br />Estimate the acreage of the site with each of the following cover types before and after development: <br />Table 4. Land Cover of the Project Site Before and After (Yield Plan) the Proposed Development <br />Cropland <br />130 <br />0 <br />Residential <br />0 <br />74 <br />Grassland <br />1 <br />0 <br />Stormwater basin <br />0 <br />21 <br />Wooded/forested <br />0 <br />0 <br />Wetlands' <br />16 <br />8 <br />Lawn/Landscaping' <br />2 <br />34 <br />Facility Operation <br />3 <br />0 <br />Road Right -of -Way <br />6 <br />20 <br />Public Trail <br />0 <br />1 <br />TOTAL <br />158 <br />158 <br />' Wetlands are calculated from the National Wetland Inventory (NWI). A wetland delineation has not been conducted on site yet. The mapped <br />NWI features overlap with the private and public drainage features present on site. <br />z The lawn/landscaping acreage after development does not reflect the lawn associated with each residential home. This is included in the <br />residential cover type <br />See Appendix A, Figures 4 and 5 for a graphic representation of this data. <br />PAGE 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.