Laserfiche WebLink
aALLIANT ENVIRONMENTAL ASSESSMENT WORKSHEET II Robinson Sod Farm <br />8. Permits and Approvals Required <br />List all known local, state and federal permits, approvals, certifications and financial assistance for the <br />project. Include modifications of any existing permits, governmental review of plans and all direct and <br />indirect forms of public financial assistance including bond guarantees, Tax Increment Financing and <br />infrastructure. All of these final decisions are prohibited until all appropriate environmental review has <br />been completed. See Minnesota Rules, Chapter 4410.3100. <br />The permits listed below in Table 4 are the permits required for the proposed project. <br />Table 5. Required Permits and Approvals for the Proposed Project <br />U.S. Army Corps of Engineers (USACE) Clean Water Act Section 404 Permit To be submitted <br />Minnesota Department of Health Watermain Extension Permit To be submitted <br />(MDH) <br />Minnesota Department of Natural Water Appropriation Permit (Construction Dewatering) To be submitted <br />Resources (MN DNR) <br />Conditional Letter of Map Revision (CLOMR) <br />To be submitted, if <br />necessary <br />Minnesota Pollution Control Agency National Pollution Discharge Elimination System <br />To be submitted <br />(MPCA) (NPDES)/State Disposal System (SDS) General Permit <br />Sanitary Sewer Extension Approval <br />To be submitted <br />Section 401 Water Quality Certification or Waiver <br />To be submitted <br />10-day Demolition Notification <br />If needed <br />Rice Creek Watershed District Wetland Conservation Act Delineation Boundary <br />To be submitted <br />Concurrence <br />Wetland Impact and Replacement Plan <br />To be submitted <br />Stormwater Management Plan <br />To be submitted <br />Erosion and Sediment Control Plan <br />To be submitted <br />Floodplain Alteration Permit <br />To be submitted <br />Public Drainage System Permit <br />To be submitted <br />Anoka County Access Permit(s) <br />To be submitted <br />Right -of -Way Permit <br />To be submitted <br />City of Lino Lakes Rezoning and Preliminary Plat <br />To be submitted <br />Final Plat Approval <br />To be submitted <br />Municipal Water Connection Permit <br />To be submitted <br />Sanitary Sewer Connection Permit <br />To be submitted <br />Grading Permit <br />To be submitted <br />Building Permit <br />To be submitted <br />PAGE 6 <br />