My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08-01-2022 Council Work Session Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2022
>
Searchable Packets
>
08-01-2022 Council Work Session Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2022 7:05:31 PM
Creation date
8/3/2022 12:34:39 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
08/01/2022
Council Meeting Type
Work Session Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
831
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Custom Fire Apparatus, Inc. <br />When the auxiliary brake is engaged, the transmission shall automatically shift to second gear to decrease <br />the rate of speed assisting the secondary braking system and slowing the vehicle. <br />TRANSMISSION COOLING SYSTEM <br />The transmission shall include a water to oil cooler system located in the cooling loop between the <br />radiator and the engine. The transmission cooling system shall meet all transmission manufacturer <br />requirements. The transmission cooling system shall feature continuous flow of engine bypass water to <br />maintain uninterrupted transmission cooling. <br />TRANSMISSION DRAIN PLUG <br />The transmission shall include an original equipment manufacturer installed magnetic transmission fluid <br />drain plug. <br />TRANSMISSION WARRANTY <br />The Allison EVS series transmission shall be warranted for a period of five (5) years with unlimited <br />mileage. Parts and labor shall be included in the warranty. <br />PTO LOCATION <br />The transmission shall have two (2) power take off (PTO) mounting locations, one (1) in the 8:00 o'clock <br />position and one (1) in the 1:00 o'clock position. <br />All drivelines shall be heavy duty metal tube and equipped with MSI 1810 series universal joints for the <br />main drivelines, and 1710 series for the inter -axle shaft. The shafts shall be dynamically balanced prior <br />to installation to alleviate future vibration. In areas of the driveline where a slip shaft is required, the <br />splined slip joint shall be coated with Glide Coat®. The drivelines shall include Meritor brand a joints <br />with thrust washers. <br />MIDSHIP PUMP / GEARBOX <br />A temporary jackshaft driveline shall be installed by the chassis manufacturer to accommodate the <br />mid -ship split shaft pump as specified by the apparatus manufacturer. <br />MIDSHIP PUMP / GEARBOX MODEL <br />The midship pump/gearbox provisions shall be for a Waterous CSUC20 pump. <br />MIDSHIP PUMP GEARBOX DROP <br />The Waterous pump gearbox shall have a `B" (short) drop length. <br />MIDSHIP PUMP RATIO <br />The ratio for the midship pump shall be 2.27:1. <br />MIDSHIP PUMP LOCATION C/L SUCTION TO C/L REAR AXLE <br />The midship pump shall be located so the dimension from the centerline of the suction to the centerline <br />of the rear axle is 110.00 inches. <br />07/26/22 <br />-22- <br />
The URL can be used to link to this page
Your browser does not support the video tag.