My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08-22-2022 City Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2022
>
Searchable Packets
>
08-22-2022 City Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2022 7:40:07 PM
Creation date
8/19/2022 4:22:01 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
08/22/2022
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
213
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SERVICE GROUP: <br />Water/Wastewater <br />REGISTRATION: <br />Professional Engineer <br />M N #57814 <br />EDUCATION: <br />MEng in Environmental <br />Processes, Cornell <br />University, 2014 <br />BA Physics and <br />Mathematics, St. Olaf <br />College, 2011 <br />Jon Christensen, PE 1 <br />CONSTRUCTION PROJECT MANAGER/OBSERVER <br />Jon is a Professional Engineer with eight years of experience in water and wastewater <br />engineering including: water supply systems, sanitary sewer collection systems and water <br />and wastewater treatment facilities. Prior to joining WSB, Jon spent two years with a <br />non -governmental organizations in Honduras designing and constructing electricity - <br />free sustainable drinking water treatment plants. At WSB, he works with growing and <br />developed communities in the expansion and rehabilitation of their water and sewer <br />infrastructure. He has experience in project planning, feasibility studies, computer <br />modeling, design, bidding, construction administration and observation, operator <br />training, and community engagement. <br />Granular Activated Carbon Water Treatment Plant I St. Paul Park, MN <br />CLIENT: CITY OF ST. PAUL PARK <br />PROJECT DURATION: MAR 2018 - OCT 2020 <br />Conducted a feasibility study to evaluate water supply and treatment alternatives. Completed <br />water distribution system modeling to identify water distribution system improvements associated <br />with the water treatment plant (WTP). Provided design, bidding, and construction administration <br />and observation for the granular activated carbon (GAC) WTP. Coordinated with state agencies, <br />laboratories, and the community to satisfy stakeholder expectations and provide quality drinking <br />water to the city's residents and businesses. <br />Water Treatment Plant Improvements I Tonka Bay, MN <br />CLIENT: CITY OF TONKA BAY <br />PROJECT DURATION: MAY 2018 - NOV 2020 <br />Completed a water treatment plant (WTP) evaluation to identify needed improvements. Provided <br />design, bidding, and construction services for the WTP improvements. Performed construction <br />administration and observation, assisted with Drinking Water Revolving Fund (DWRF) application <br />and construction administration per DWRF contract requirements. <br />Water Treatment Plant Feasibility Study I Lino Lakes, MN <br />CLIENT: CITY OF LINO LAKES <br />PROJECT DURATION: MAR 2020 - JUN 2020 <br />Conducted a feasibility study to evaluate water supply and treatment alternatives. Completed water <br />distribution system modeling to identify water distribution system improvements associated with <br />the water treatment plant (WTP). Coordinated with state agencies, laboratories, and the <br />community to satisfy stakeholder expectations and provide quality drinking water to the city's <br />residents and businesses. <br />A Proposal for Design, Bidding, and Construction Administration for a <br />Water Treatment Plant for City of Lino Lakes Project Personnel 112 <br />
The URL can be used to link to this page
Your browser does not support the video tag.