My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08-22-2022 City Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2022
>
Searchable Packets
>
08-22-2022 City Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2022 7:40:07 PM
Creation date
8/19/2022 4:22:01 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
08/22/2022
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
213
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SERVICE GROUP: <br />Municipal <br />REGISTRATIONS: <br />Class A Water Operator <br />SA Wastewater Treatment <br />Facility <br />Certified Tree Inspector <br />EDUCATION: <br />Bachelors in Business <br />Management, College of St. <br />Scholastica <br />MEMBERSHIPS + <br />RECOGNITIONS: <br />APWA: Chapter President <br />(2017) & Current Alternate <br />Delegate <br />AWWA: 20-year member <br />MSSA <br />Chris Petree 1 <br />Pi7/_11I:111:0I:7�e\Iu1�►I�»_\►l�il»:7e\[i1:7b9»HIe\�6�1 <br />Serving as WSB's Director of Operations, Chris brings a unique perspective to our clients <br />as a past public works system operator at multiple organizations. He has served as a <br />Director of Public Works in three communities and public works profession for 25 years. <br />Prior to working at WSB, Chris served as Director of Public Works for the City of Rochester <br />from 2018-2019, the City of Lakeville from 2008-2018, the City of Hugo from 1999-2008 <br />and worked for the City of Apple Valley prior to 1999. Chris holds a Class A Water Supply <br />System Operators License from the MDH and a Class A Collection System Operators <br />License from the MPCA. <br />Lakeville Water Treatment Facility Expansion I Lakeville, MN <br />CLIENT: CITY OF LAKEVILLE <br />DURATION: JAN 2012 - JUN 2015 <br />Chris served as the Project Manager and Owner Representative for the design and construction of <br />the first major water treatment facility upgrade in nearly 15 years. This projected included increasing <br />the treatment, pumping and storage capacity of the water treatment facility by over six MGD. <br />Lakeville Well Development I Lakeville, MN <br />CLIENT: CITY OF LAKEVILLE <br />DURATION: AUG 2008 - JUN 2018 <br />Chris served as the Project Manager and Owner Representative for the design and construction <br />of four municipal wells (Wells #19-22). These wells were constructed in the Prairie Du Chien -Jordan <br />and Tunnel City-Wonewoc aquifers with pumping capacities from 500-1500 GPM. Chris' oversight <br />of these projects started from conceptual stages of master planning of a well field to placing them <br />into service. <br />Hugo Well Development I Hugo, MN <br />CLIENT: CITY OF HUGO <br />DURATION: JUN 1999 - AUG 2008 <br />Chris served as the Project Manager and Owner Representative for the design and construction of <br />three municipal wells (Wells #3-5). All of these wells included the construction of well houses. These <br />wells were constructed in the Prairie Du Chien -Jordan aquifers with pumping capacities of 1000- <br />1500 GPM. The well houses included onsite chemical feed systems including chlorine, fluoride and <br />polyphosphate. <br />A Proposal for Design, Bidding, and Construction Administration for a <br />Water Treatment Plant for City of Lino Lakes Project Personnel 113 <br />
The URL can be used to link to this page
Your browser does not support the video tag.