My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08-22-2022 City Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2022
>
Searchable Packets
>
08-22-2022 City Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2022 7:40:07 PM
Creation date
8/19/2022 4:22:01 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
08/22/2022
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
213
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REGISTRATION: <br />Professional Engineer <br />Minnesota # 46184 <br />EDUCATION: <br />Bachelor of Science <br />Electrical Engineering <br />North Dakota State <br />University, 2003 <br />Aaron R. Mueller, PE <br />ELECTRICAL TEAM LEADER 4 <br />Aaron specializes in the electrical design of various building types and understands <br />Municipal remodel, addition and new construction projects and their power, lighting, <br />and low voltage coordination implications. When involved in Municipal Water and <br />Wastewater Treatment Projects Aaron works closely with the Process Engineers and <br />City Staff to understand the goals and objectives of the project. From there he bases <br />his power and control methodologies to achieve these goals. Aaron's background as <br />an electrical contractor roots his designs in practicality and constructability to mitigate <br />construction delays and change orders. <br />Aaron will act as the electrical point of contact throughout the design process and seal <br />the documents as the Engineer of Record. He will coordinate with other electrical design <br />staff and other disciplines for quality control. As the project enters the construction <br />process there will be dedicated construction administration staff that Aaron will <br />collaborate to complete a successful project. <br />CURRENT PROJECTS: <br />Water Treatment Plant Filter Addition - Carver, MN <br />CLIENT: CARVER, MN <br />Emergency Water Plant <br />CLIENT: OAKDALE, MN <br />Water Treatment Plant Improvements <br />CLIENT: MAYER, MN <br />Reverse Osmosis Treatment System <br />CLIENT: ST. JOHN'S UNIVERSITY, COLLEGEVILLE, MN <br />Water Treatment Plant Chlorine Improvements <br />CLIENT: BROOKLYN PARK, MN <br />Wastewater Treatment Plant Improvements <br />CLIENT: MADELIA, MN <br />A Proposal for Design, Bidding, and Construction Administration for a <br />Water Treatment Plant for City of Lino Lakes Project Personnel 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.