Laserfiche WebLink
Greg Glunz 1 <br />SENIOR DESIGNER <br />Greg has over 40 years of experience in designing water and wastewater treatment <br />facilities, which includes plan preparation, administration and inspection. Other <br />experience includes the final layout and design of municipal and industrial water supply, <br />storage, treatment and distribution, wastewater collection, conveyance and treatment <br />projects. Greg also has experience in potable water such as the design of well houses, <br />booster stations, water towers, and ground storage reservoirs. <br />West Water Treatment Plant I Chanhassen, MN <br />SERVICE GROUP: <br />CLIENT: CITY OF CHANHASSEN <br />Water and Wastewater <br />PROJECT DURATION: JAN 2016 - SEP 2018 <br />EDUCATION: <br />Greg performed preliminary plant layout as well as final design and plan preparation functions for <br />Associate Degree in Civil- <br />the water treatment facility site, process, and structural portions of the project. The project included <br />Structural Technology, <br />watermain additions and improvements, 6 cell gravity filter, chemical feed systems, clearwell, high <br />Chippewa Valley Technical <br />service and backwash pumps, reclaim tanks, and site improvements. <br />College, Eau Claire, WI, <br />1977 <br />Advanced Oxidation Process Water Treatment Plant I St. Anthony, MN <br />CLIENT: ST. ANTHONY VILLAGE <br />Engineering Short Courses: <br />PROJECT DURATION: JUN 2015 - MAY 2018 <br />Wastewater Treatment <br />Greg was tasked with preliminary layout, plan preparation, design and final layout for the City's <br />Process Design & On -Site <br />Advanced Oxidation Process Dioxane Removal Water Treatment Plant including existing GAC filter <br />Treatment and Disposal of <br />plant modifications, three unit, double stacked UV treatment units, hydrogen peroxide storage <br />Wastewater, University of <br />and feed system, water supply booster pumps, existing ground reservoir improvements and site <br />Wisconsin - Madison,1980 <br />improvements. <br />Civil Engineering <br />Granular Activated Carbon Water Treatment Plant I St. Paul Park, MN <br />Curriculum, University of <br />CLIENT: CITY OF ST. PAUL PARK <br />Minnesota Extension,1981- <br />1984 <br />PROJECT DURATION: MAR 2018 - OCT 2020 <br />Greg performed preliminary plant layout, concept drawings, final design layout and construction <br />MEMBERSHIPS & <br />plan preparation functions for the water treatment facility in the general, site, process and structural <br />RECOGNITIONS: <br />portions of the project. The project included an enclosed eight vessel filtration adsorber activated <br />Water Environment <br />carbon treatment plant with exterior underground dual backwash holding tanks. Tasks also included <br />Federation <br />construction observation and administration assistance and construction record plan preparation. <br />Central States Water <br />Environment Association <br />A Proposal for Design, Bidding, and Construction Administration for a <br />Water Treatment Plant for City of Lino Lakes Project Personnel 119 <br />