My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08-22-2022 City Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2022
>
Searchable Packets
>
08-22-2022 City Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2022 7:40:07 PM
Creation date
8/19/2022 4:22:01 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
08/22/2022
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
213
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WSB PROJECT EXPERIENCE EXAMPLE <br />Granular Activated Carbon Water Treatment Plant <br />CLIEN i CITY OF ST. PAUL PARK <br />LOCATIu— ST. PAUL PARK, MN <br />DURATION: 2020 <br />The Granular Activated Carbon Water Treatment Plant <br />was constructed to support public health by bringing <br />cleaner drinking water to residents and businesses <br />within the St. Paul Park community. Since 2007, the <br />Minnesota Department of Health (MDH) has been <br />monitoring the concentration levels of perfluoroalkyl <br />and polyfluoroalkyl substances (PFAS) in the city's water <br />supply. PFAS are a family of manmade chemicals that <br />do not naturally decompose due to their heat and water <br />resistant structure. Studies have found that consuming <br />drinking water with elevated levels of PFAS, over time, <br />can be associated with high cholesterol, reduced <br />immune response, thyroid disease, kidney cancer and <br />other distressing health problems. <br />In June of 2018, the MDH notified St. Paul Park officials, <br />stating that two of its three water wells exceeded <br />the recommended amount of PFAS to be considered <br />safe for public consumption. In response to this <br />pervasive health threat, WSB partnered with the city <br />to design a water treatment facility and remove PFAS <br />from the community drinking water and surrounding <br />environment. After completing a feasibility study, <br />Granular Activated Carbon (GAC) Water Treatment Plant <br />was designed, bid and constructed. The GAC Water <br />Treatment Plant was delivered under budget and on <br />schedule. <br />KEY WSB STAFF: GREG JOHNSON, JON CHRISTENSEN, <br />GREG GLUNZ <br />A Proposal for Design, Bidding, and Construction Administration for a <br />Water Treatment Plant for City of Lino Lakes Relative Experience, Qualifications, & References 28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.