My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08-22-2022 City Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2022
>
Searchable Packets
>
08-22-2022 City Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2022 7:40:07 PM
Creation date
8/19/2022 4:22:01 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
08/22/2022
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
213
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
zt �I ..T r L I,LI_I�� �_r =rt r—� <br />1--7.- Z-- -i- <br />i <br />_ Tr1 t it l_l-I ri rI T= Ir;_r <br />LlL <br />T <br />T <br />�Li <br />T, <br />WSB proposes to complete all of the work described in this <br />for the following estimated fees: <br />L r ram,_ <br />proposal <br />TI <br />- <br />1 i-I r_I 1 LL I L_:I r, L tZ 7 7 -t <br />L = I =T= L.Lr i <br />i f - <br />Design: $696,940 (3.32% of preliminary estimated <br />--1 <br />Ll i r ��_rl_, L t-r _i <br />�- t <br />-LLL_�--1 <br />construction cost) <br />r <br />Bidding: $19,021 (0.09% of preliminary estimated <br />- <br />ZLT_ i i <br />construction cost) <br />I -L L <br />Construction Administration, Observation, and Plant Start- <br />� _ <br />up: $731,769 (3.48% of preliminary estimated construction <br />cost) <br />-� <br />Total Design, Bidding, and Construction: $1,447,730 <br />6.89% of preliminary estimated construction cost <br />The estimated task hours and hourly billing rates for each team <br />member for the proposed hourly not -to -exceed fees are listed <br />in the table below to the right. The estimated fee to provide <br />construction observation for up to 18-months of construction <br />accounts for approximately 33 percent of the total estimated <br />fee. WSB's subconsultant fees account for approximately 23 <br />percent of the total estimated fee. <br />The proposed hourly not -to -exceed fees include 40 hours of <br />construction observation per week For up to 18-months of pre - <br />construction set-up and construction observation. Additional <br />on site construction management and construction observation <br />hours can be provided for additional fees at our currently hourly <br />billing rates if required by the city. Our standard billing rates are <br />adjusted annually. Costs associated with vehicle mileage, cell <br />phones, reproduction of common correspondence, and mailing <br />are included in the above hourly rates and will not be charged <br />separately as reimbursable expenses. The total estimated fee <br />will not be exceeded without prior authorization from the city. <br />Construction materials testing services are not included in this <br />proposal and will be estimated during the final design phase <br />when quantities for testing can be determined. <br />Funding administration services are not included in this proposal <br />but can be provided at our standard hourly rates upon request. <br />A Proposal for Design, Bidding, and Construction Administration for a <br />Water Treatment Plant for City of Lino Lakes Proposed Fees 35 <br />
The URL can be used to link to this page
Your browser does not support the video tag.