My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08-22-2022 City Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2022
>
Searchable Packets
>
08-22-2022 City Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2022 7:40:07 PM
Creation date
8/19/2022 4:22:01 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
08/22/2022
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
213
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXAMPLE AWARD NOMINATION I WEST WATER TREATMENT PLANT <br />INNOVATIVE CONSTRUCTION MANAGEMENT <br />The West Water Treatement Plant project was completed <br />under budget and on schedule. The general contractor, <br />Rice Lake Construction Group, provided construction <br />management and coordinated 62 subcontractors <br />and major material suppliers. Over 220 shop drawing <br />submittals, 80 requests for information (RFIs), 10 field <br />orders, and many other clarifications were processed <br />through the duration of the project to ensure the plant <br />was constructed properly and up to industry standard. <br />The contractor conducted extensive pre -construction <br />planning by investing time with project staff to develop <br />key strategies for construction. For example, they <br />developed an effective strategy for the mass excavation <br />of the structures while creating a "working platform" <br />out of the side of a large hill on site. With the project <br />being located mostly at the top of the hill, surrounded <br />by steep slopes, there were little means for access <br />and construction staging. Without excavating the <br />project area the contractor would not have had enough <br />work space or access for materials storage, requiring <br />additional materials to be stored off site. <br />The contractor also streamlined the planning process by <br />using Critical Path Management/Scheduling. Knowing <br />the critical path and adjusting as needed was essential <br />to proper job planning. The critical path schedule was <br />the primary tool used to manage everything from the <br />submittal/approval stage to procurement, delivery, and <br />installation. <br />4 <br />A Proposal for Design, Bidding, and Construction Administration for a <br />Water Treatment Plant for City of Lino Lakes Appendix 146 <br />
The URL can be used to link to this page
Your browser does not support the video tag.