Laserfiche WebLink
CITY O F <br />11N KES <br />To: Diane Hankee, Kelsey Gelhar <br />From: Andy Nelson <br />Date: August 1st, 2022 <br />Environmental Memo <br />Re: Environmental Comments/Rehbein Site Development Prep <br />Environmental had the following comments on 8/01/22. <br />1. A trained individual with current certification in erosion and sediment control <br />must perform inspections at a minimum every 7 days and within 24 hours <br />after a rainfall event greater than '/2 inch in 24 hours. Inspection records must <br />be retained with the SWPPP and include information detailed in 11.11 of the <br />Construction Stormwater General Permit. Contact information for the <br />inspector must be provided to the city prior to any soil disturbance on the site. <br />2. Stabilization method must be specified, including a seed mix (ex: Mn DOT <br />seed mix XX-XXX) and a method for stabilizing the steep slopes of the <br />stockpile. <br />3. Erosion blanket must be a natural net variety. This must be specified on the <br />details sheet. <br />0 Page 1 <br />