Laserfiche WebLink
wsb <br /> Memorandum <br /> To: Katie Larsen, City Planner, City of Lino Lakes <br /> From: Kelsey Gelhar,WSB <br /> Diane Hankee, City Engineer, City of Lino Lakes <br /> Date: August 1, 2022 <br /> Re: Rehbein Site Development Prep <br /> Plan Review <br /> WSB Project Number—020902-000 <br /> WSB has reviewed the plans for the Rehbein Site Development Prep site in Lino Lakes, MN, <br /> prepared by Ryan A+E, Inc., received on July 11, 2022. These comments are based on the <br /> following final plan sets and documents: <br /> 0 <br /> • Rehbein Site Development Prep, Grading Plan prepared by Ryan A+E, Inc., dated July <br /> Z 11, 2022, received July 11, 2022. <br /> m • ALTA/NPS Land Title Survey prepared by E.G. Rud & Sons, Inc., dated December 22, <br /> 3 2021, received July 11, 2022 <br /> Applicant to respond to these comments in writing on this word document.Any changes to the <br /> plans that are not associated with these comments shall be identified by either a summary in the <br /> 00 response or in the plans with a revision cloud or note. <br /> N <br /> 10 <br /> Engineering <br /> • General <br /> _.. The Rehbein Site Development Prep plan proposes to move fill material from the existing <br /> Rehbein property in Centerville to two properties located on 21st Avenue S (PIDs#24-31- <br /> 22-24-0002 and#24-31-22-24-0009)for future building pads. The site will be accessed from <br /> a215c Avenue S and Northern Lights Boulevard. The parcels being utilized for the earth <br /> Z <br /> moving operation are approximately 17.69 acres in area. <br /> a <br /> Two fill stockpile locations are proposed. The proposed eastern stockpile will be <br /> approximately 2.8 acres in area, will have a maximum height of 12 feet(maximum elevation <br /> N of 916), and will be approximately 33,000 cubic yards of fill material according to the plans. <br /> LU <br /> The proposed western stockpile is proposed immediately adjacent to the stockpile from the <br /> Rehbein Black Dirt CUP (CUP 2022-001), will be approximately 2.4 acres in area, will have <br /> a maximum height of 10 feet (maximum elevation of 916), and will be approximately 32,000 <br /> W cubic yards of fill material according to the plans. <br /> W <br /> Comments: <br /> 1. No filling will be allowed in easement in Outlot A of the Clearwater Creek <br /> W Business Center Plat(PID 24-31-22-24-0009). <br />