My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2022-088 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2022
>
2022-088 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2022 7:21:56 PM
Creation date
9/2/2022 9:32:33 AM
Metadata
Fields
Template:
City Council
Council Document Type
Resolutions
Meeting Date
08/22/2022
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
w .. . . _ <br /> .. Acres Fee <br /> 1. Sanitary Sewer Trunk Unit Fee ($1,630/unit; 2.92 units/Acre) $0 <br /> 2. City Sewer Availability Fee ($1,525/SAC Unit) $0 <br /> 3. Water Trunk Unit Fee ($2,341/unit; 2.92 units/Acre) $0 <br /> 4. City Water Availability Fee ($1,473/SAC Unit) $0 <br /> 5. City Surface Water Management Fee ($11,073/Acre) $0 <br /> Total Estimated (Budget)Developer Fees $0 <br /> IV. RECORD DRAWINGS. <br /> a. Upon project completion, Developer shall submit record drawings in <br /> electronic format verifying the location of the stockpiles. The as-built survey <br /> must include, but is not limited to,proposed and final contours with adequate <br /> elevation shots to show conformance, property irons (to be exposed in field), <br /> and the 100-Year High Water Level(HWL) of all ponds, lakes, and wetland <br /> areas. The files shall be drawn in Anoka County NAD 83 Coordinate system <br /> and provided in both AutoCAD .dwg and Adobe .pdf file formats. The plans <br /> shall include accurate locations, dimensions, elevations,grades, slopes and all <br /> other pertinent information concerning the complete work. <br /> b. No securities will be fully released until all record drawings have been <br /> submitted and accepted by the City Engineer. <br /> V. COMPLETION DATE. <br /> If the activities authorized by site plan approval are not initiated within twelve(12) <br /> months from the final execution of this agreement,then Developer will need to start <br /> the site plan approval process from the beginning. The Developer shall complete all <br /> On Site Work as described in Section I1 A within 18 months of approval of the <br /> Conditional Use Permit and the Site Performance Agreement. <br /> The Developer may request a reasonable extension of time from the City and will <br /> have to apply for renewal of the Conditional Use Permit.Renewal must be approved <br /> by the City Council. If the extension is granted, it shall be conditioned upon <br /> updating the security posted by the Developer to reflect cost increases and the <br /> extended completion date. <br /> VI. GUARANTEE. <br /> A. The Developer will fully and faithfully comply with all terms and <br /> conditions of any and all contracts entered into by the Developer. <br /> Concurrently with the execution hereof by the Developer,the Developer <br /> will furnish to, and at all times thereafter maintain with the City, a cash <br /> deposit, certified check, or Irrevocable Letter of Credit, based on thirty- <br /> Rehbein Site Development Preparation Performance Agreement page 3 of 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.