My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2022-088 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2022
>
2022-088 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2022 7:21:56 PM
Creation date
9/2/2022 9:32:33 AM
Metadata
Fields
Template:
City Council
Council Document Type
Resolutions
Meeting Date
08/22/2022
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IL ON-SITE WORK. <br /> A. On-Site Work. The On-Site Work shall consist of the improvements <br /> described in the approved Plans, to include any approved subsequent <br /> amendments, and shall be in compliance with all applicable statutes, codes <br /> and ordinances of the City. The On-Site Work includes but is not limited <br /> to the erosion control, material hauling from the site in Centerville, <br /> grading and compacting material, and site restoration. <br /> Such improvements shall be completed in accordance with Section IV <br /> herein. <br /> B. Cost Estimates. The Developer shall provide the City with a written <br /> estimate of all applicable costs of the On-Site Work, itemized by type;the <br /> estimates shall be based upon the actual estimates provided by the <br /> contractors who are to do the Work. Said cost estimates shall be reviewed <br /> by the City, and the City shall establish the actual amount of the financial <br /> guarantee. The description and estimated cost of Developer's On-Site <br /> Work are as follows: <br /> Descrtpt�ori;of Tmgrovements Estimated Costs <br /> 1. Lighting $ 0.00 <br /> 2. Fences/ Screen Structures $ 0.00 <br /> 3. Trash Disposal Structures $ 0.00 <br /> 4. Curbing/Islands/Delineators $ 0.00 <br /> 5 Storm Drainage Systems/ Sewers/Catch Basins/ $ 0.00 <br /> Culverts/ Swales <br /> 6. Public Trails and/or Sidewalk $ 0.00 <br /> 7. Private Trials and/or Sidewalk $ 0.00 <br /> 8. Driveway/Curb cut/Parking Lot/Fire Lane $ 0.00 <br /> 9. Water mains/Hydrants / Sanitary Sewers $ 0.00 <br /> 10. Landscaping $ 0.00 <br /> 11. Site Grading $ 10,000.00 <br /> 12. Erosion Control $ 7,500.00 <br /> Total Estimated Cost of Developer Improvements $ 17,500.00 <br /> Security Requirement (Total * 35%) $ 6,125 <br /> III. DEVELOPER FEES. Not Applicable <br /> Rehbein Site Development Preparation Performance Agreement page 2 of 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.