Laserfiche WebLink
r, r <br /> Define . Constraints Analyze Source Water <br /> The purpose of this task is not to reconstruct what All existing water quality data for Wells 1,3,5,and 6 <br /> has already been accomplished, but to establish will be reviewed with respect to primary and secondary <br /> a working foundation for the study as well as drinking water standards as well as contaminants and <br /> establish the key issues to be addressed, potential emerging contaminants. Our team will then develop <br /> constraints, and alternatives to be investigated. a comprehensive treatment plan that addresses <br /> The water treatment plant design alternatives all identified contaminants,ensures regulatory <br /> will be constrained by a number of factors.As compliance,and produces high quality water for the <br /> alternative solutions are evaluated, it will be city's customers.WSB will also look ahead and evaluate <br /> important to consider potential implications of a the water quality parameters that will likely need to be <br /> dynamic regulatory environment. evaluated for both conventional and biological filtration. <br /> WSB will define constraints associated with existing Our team has experience coordinating,developing pilot <br /> regulations and possible future changes in both testing protocols,building pilot plants,and performing <br /> national and local level regulations by completing pilot studies related to iron, manganese,and ammonia in <br /> a Safe Drinking Water Act compliance audit. groundwater systems with our water treatment pilot plant <br /> Although preliminary indications show that the and trailer.We will utilize the pilot study report completed <br /> proposed water treatment regulations should have by WSB as a design basis for the proposed Water <br /> minimal impact on the design of the proposed Treatment Plant. <br /> water treatment facility and on the city's operations, <br /> Before preparing the final design plan,the source water <br /> alternative scenarios should be considered on how <br /> regulations will evolve in the near future. will be further analyzed.This analysis will include the <br /> following elements: <br /> Understanding and meeting your requirements is <br /> the foundation for WSB's quality project delivery Analyze Source Water Chemistry <br /> philosophy. Our primary goals are to clearly define Identify known primary contaminants <br /> your requirements and expectations in terms of <br /> deliverables, project schedule and budget,and to Identify known secondary contaminants <br /> manage the project to meet these requirements. <br /> • Identify emerging contaminants(based on <br /> anticipated life of facility) <br /> Summarize Results <br /> A Proposal for Design,Bidding,and Construction Administration for a <br /> Water Treatment Plant for City of Lino Lakes Project Understanding&Approach 5 <br />