My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2022-091 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2022
>
2022-091 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2022 7:24:18 PM
Creation date
9/2/2022 9:39:30 AM
Metadata
Fields
Template:
City Council
Council Document Type
Resolutions
Meeting Date
08/22/2022
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Special Considerations <br /> NEIGHBORING PROPERTY IMPACTS AESTHETIC CONSTRUCTION MATERIALS <br /> The feasibility study report completed by WSB explored The final design will include aesthetic treatments and <br /> potential impacts of the water treatment facility on construction materials based on input received from <br /> neighboring properties due to noise,odors,operating City Staff and the City Council.WSB uses the one of <br /> hours,traffic,and other identified sources of impact, the most advanced virtual rendering software in the <br /> and recommend a process for mitigating any identified world to provide renderings that appear extremely <br /> impacts during the final design process. realistic and simulate light and shadows during various <br /> times of the day.We will also provide 3D to allow the <br /> To keep the public informed,WSB's nationally recognized viewer to pan around the facility 360 degrees to view <br /> visualization expert will create a high definition <br /> the proposed facility from any orientation.We have <br /> visualization that starts at an aerial view of the City of included example images from a recent water treatment <br /> Lino Lakes.The location of the water treatment plant facility design that were generated from this software in <br /> will then be highlighted along with the location of the <br /> the appendix. <br /> existing and recommended water distribution system <br /> improvements.This overall view will then change to a <br /> view of the water treatment plant in its location,allowing EDUCATIONAL TOUR ACCOMMODATIONS <br /> for a review of the facility. From this vantage point, <br /> a review of the design aesthetic alternatives will be The final design will contemplate the construction of <br /> shown.This real time visualization will allow the viewer(s) additional improvements required to accommodate <br /> to either explore the new water treatment plant in a educational tours of the WTP based on future direction <br /> standard visualization setting. received from the City Council after considering the <br /> benefits of providing educational tours versus the <br /> The recently constructed Chanhassen West Water associated increase in project costs. <br /> Treatment Plant was constructed in the middle of a <br /> residential neighborhood.We know firsthand how <br /> critical it will be to design a water treatment facility ESTIMATED COSTS <br /> that properly addresses noise, odors,operating hours, The final design will include updated estimated <br /> and traffic.This plant include specially designed sound construction and operating costs for the groundwater <br /> attenuation devices for the emergency generator and treatment facility over the anticipated life of the facility. <br /> the ventilation vans inside the plant. Because of these Estimated costs will assume industry standard costs <br /> special design features, even the closest neighbors for a water treatment facility.WSB has specialized cost <br /> cannot hear any sound from the plant during normal estimating staff with contractor experience that will <br /> plant operations.This plant also includes special safety help prepare accurate construction cost estimates for <br /> features and technology for the storage of 1-ton chlorine this project. <br /> gas cylinders. <br /> A Proposal for Design,Bidding,and Construction Administration for a <br /> Water Treatment Plant for City of Lino Lakes Project Understanding&Approach 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.