Laserfiche WebLink
Henry Meeker, E1 <br /> GRADUATE ENGINEER <br /> Henry is a starting water resources engineer in training. After graduation with a civil <br /> ' engineering degree focused on water resources, he began working full time with WSB. <br /> Henry has experience with bathymetry mapping, spread and run calculations, and pipe <br /> design. <br /> fl 1 3 fr f t ,t• <br /> ifr I� Sj3 3*3.: f .4t�1 <br /> SERVICE GROUP: Champlin Heights Road Reconstruction Champlin, MN <br /> Water Resources <br /> CLIENT: CITY OF CHAMPLIN <br /> EDUCATION: PROJECT DURATION: JUL 2019- AUG 2019 <br /> University of Minnesota, Henry was part of the team that completed feasibility-level design of new stormwater catchbasins <br /> Twin Cities,2021 <br /> and conveyance systems for the project area.This work included GIS drainage mapping and spread <br /> MEMBERSHIPS: and run calculations.The project ultimately helped maintain drivable streets for the city of Champlin. <br /> American Society of Civil <br /> Engineers <br /> Woodbury Pond Bathymetry I Woodbury, MN <br /> CLIENT: CITY OF WOODBURY <br /> PROJECT DURATION: JUN 2019 <br /> Based on data collected in the field, Henry used GIs software to build bathymetric maps of <br /> numerous ponds. These maps were used by the city of Woodbury to assess pond behavior and <br /> pollutant removal capacity. <br /> MS4 Monitoring I St. Paul, MN <br /> CLIENT: CITY OF ST. PAUL <br /> PROJECT DURATION: JUN 2020- SEP 2020 <br /> Henry was part of a team that monitored stormwater flows and quality throughout the summer of <br /> 2020 for the city of St. Paul. Monitoring involved data collection, sample collection, and analysis. <br /> This monitoring resulted in the development of the city's municipal separate storm sewer system <br /> (MS4)permit,required annually by the Minnesota Pollution Control Agency. <br /> A Proposal for Design,Bidding,and Construction Administration for a <br /> Water Treatment Plant for City of Lino Lakes Project Personnel 15 <br />