My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2022-091 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2022
>
2022-091 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2022 7:24:18 PM
Creation date
9/2/2022 9:39:30 AM
Metadata
Fields
Template:
City Council
Council Document Type
Resolutions
Meeting Date
08/22/2022
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SENIOR DESIGNER <br /> woom Greg has over 40 years of experience in designing water and wastewater treatment <br /> facilities, which includes plan preparation, administration and inspection. Other <br /> experience includes the final layout and design of municipal and industrial water supply, <br /> = - storage, treatment and distribution, wastewater collection, conveyance and treatment <br /> projects. Greg also has experience in potable water such as the design of well houses, <br /> booster stations,water towers, and ground storage reservoirs. <br /> West Water Treatment Plant I Chanhassen, MN <br /> SERVICE GROUP: <br /> CITY OF CHANHASSEN <br /> Water and Wastewater CT DURATI', : - JAN 2016 - SEP 2018 <br /> LDJCAHON: Greg performed preliminary plant layout as well as final design and plan preparation functions for <br /> Associate Degree in Civil- the water treatment facility site,process,and structural portions of the project.The project included <br /> Structural Technology, watermain additions and improvements,6 cell gravity filter,chemical feed systems,clearwell, high <br /> Chippewa Valley Technical service and backwash pumps,reclaim tanks,and site improvements. <br /> College,Eau Claire,WI, <br /> 1977 Advanced Oxidation Process Water Treatment Plant I St. Anthony, MN <br /> CLIENT: ST. ANTHONY VILLAGE <br /> Engineering Short Courses: PROJECT DURATION: JUN 2015 - MAY 2018 <br /> Wastewater Treatment Greg was tasked with preliminary layout, plan preparation, design and final layout for the City's <br /> Process Design&On-Site Advanced Oxidation Process Dioxane Removal Water Treatment Plant including existing GAC filter <br /> Treatment and Disposal of plant modifications, three unit, double stacked UV treatment units, hydrogen peroxide storage <br /> Wastewater,University of and feed system, water supply booster pumps, existing ground reservoir improvements and site <br /> Wisconsin-Madison,1980 improvements. <br /> Civil Engineering <br /> Granular Activated Carbon Water Treatment Plant ( St. Paul Park, MN <br /> Curriculum,University of <br /> CLIENT: CITY OF ST. PAUL PARK <br /> Minnesota Extension,1981- <br /> PROJECT DURATION: MAR 2018 - OCT 2020 <br /> 1984 <br /> Greg performed preliminary plant layout, concept drawings, final design layout and construction <br /> MEMBERSHIPS & plan preparation functions for the water treatment facility in the general,site,process and structural <br /> RECOGNITIONS: <br /> Water Environment portions of the project.The project included an enclosed eight vessel filtration adsorber activated <br /> Federation carbon treatment plant with exterior underground dual backwash holding tanks.Tasks also included <br /> construction observation and administration assistance and construction record plan preparation. <br /> Central States Water <br /> Environment Association <br /> A Proposal for Design,Bidding,and Construction Administration for a <br /> Water Treatment Plant for City of Lino Lakes Project Personnel 119 <br />
The URL can be used to link to this page
Your browser does not support the video tag.