My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2022-091 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2022
>
2022-091 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2022 7:24:18 PM
Creation date
9/2/2022 9:39:30 AM
Metadata
Fields
Template:
City Council
Council Document Type
Resolutions
Meeting Date
08/22/2022
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT ENGINEER <br /> Ursinio is a professional engineer in WSB's Water and Wastewater Group. Ursinio brings <br /> a detail-oriented attitude to the team that was gained through research-based work <br /> while in graduate school. Ursinio has extensive experience in a wide variety of pilot- <br /> scale projects ranging from biological water filtration to UV disinfection of wastewater. <br /> He is also skilled in municipal water and wastewater infrastructure planning and design, <br /> bidding and construction services,hydraulic water and sanitary sewer system modeling, <br /> and wastewater treatment modeling. <br /> x., <br /> SERVICE GROUP: Biological Retrofit Feasibility Study I Baxter, MN <br /> Water/Wastewater <br /> CLIEN'i CITY OF BAXTER <br /> REGISTRATION: PROJECT DURATION: SEP 2019 - JAN 2020 <br /> Engineer in Training,ND Ursinio served as a project engineer to study the feasibility of a water treatment plant retrofit <br /> PE pending,MN project at the City of Baxter. This project included the completion of a pilot study, an analysis of <br /> the historical water demands and a projection of the water demands through the planning period, <br /> EDUCATION: <br /> MS Civil Engineering an energy consumption evaluation of the existing facility, a projection of the 20-year operational <br /> (Environmental Focus) savings generated by the proposed treatment changes,and a preliminary engineering design of the <br /> North Dakota State proposed facility upgrades. <br /> University 2017 <br /> BS Civil Engineering Monticello Water Treatment Feasibility Study I Monticello MN <br /> (Environmental Focus) CLIEN' CITY OF MONTICELLO, MN <br /> North Dakota State PROJECT DURATION: AUG 2020 - ONGOING <br /> University 2015 Ursinio is preparing a feasibility study to evaluate water supply and treatment options for the removal <br /> MEMBERSHIPS: of manganese, iron and hardness from the City's groundwater. Gravity filtration (conventional and <br /> WEF biological) and lime softening are being considered for treatment. As part of this study, Ursinio is <br /> AWWA preparing a financial analysis(funding,construction costs,and water rate changes)for each of the <br /> preferred treatment methods. <br /> CSWEA Resource <br /> Recovering and Energy <br /> Committee Member-MN Biological Filtration Feasibility Study I City of Baxter, MN <br /> CLIENT: CITY OF BAXTER <br /> PROJECT DURATION: SEP 2019 - JAN 2020 <br /> Ursinio served as a project engineer to study the feasibility of a water treatment plant retrofit project <br /> at the City of Baxter.This project included the completion of a pilot study,an analysis of the energy <br /> consumption of the existing facility, a projection of the 20-year operational savings generated by <br /> the proposed treatment changes, and a preliminary engineering design of the proposed facility <br /> upgrades. <br /> A Proposal for Design,Bidding,and Construction Administration for a <br /> Water Treatment Plant for City of Lino Lakes Project Personnel 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.