Laserfiche WebLink
TASK I DESCRIPTION <br /> 2� HOT TOTAL COS r <br /> I I FINAL PLANS AND SPECIFICATIONS PHASE <br /> K'ck ff t g with C'tystaffto 14 62,216.00 <br /> i i 2.0 2.0 2.0 2.0 2A 20 20 <br /> nt II Pinnt objectives. <br /> _ _ _....._.._... __ <br /> 12 Kickoff-meet rig with design team el 3A 3.0 3.0 3.0 310 9A 3.0 3.0 3.0 2A 2A 2.0 3A 3A 3B <br /> WSB ¢6,068.00 <br /> 1.3 Collect all required survey data 1.0 lA 40.0 _ 42 38,591.00 <br /> Obtain all required geotechnical <br /> 1.4 evaluations(12 soil borings and 1.0 Lump Sum $12,306.00 <br /> 9wtechnnieal rape n) <br /> 1.5 <br /> Pwmrovidfe wetland delineation pump Lump Sum $3,600,00 <br /> eel lA <br /> 1.6 Proper.SWPPP Plan 1.0 21) 4.0 $833.00 <br /> Evaluate.apathy of downstream <br /> sanitary sewer syarom.and lift stations <br /> 1.7 for wastewater to be discharged from 4.0 12.0 16 $2.624.00 <br /> water treatment plant. <br /> j Prepare plans and specifications for <br /> 1.8 1204nch and 24-inch raw watermain. 2-0 3.0 20,0 604 40.0 4.0 120 $18,530.00 <br /> 1 oa Birch Street. <br /> Attend up to three(3)virtual design <br /> progress meetings with City Staff <br /> 1 during final design process ro address <br /> 1.9 outstanding issues,to coordinate 9.0 9A 9.0 9A ISO Suo 9.0 BA BA 9A 9A 410 91 $14,500.00 <br /> an and specification reviews,and <br /> to review the prolect schedule for the <br /> 30-parts.plans,60-pament Plans, <br /> 95-percent plans,and final plans. <br /> 110 Apply for and secure all required 1.0 4.0 4.0 16A 2A 6.0 31 s3,790A0 <br /> permlts from regulatory agencies. <br /> Prepare and present 30-portent <br /> plans to City Council to obtain input <br /> 1.11 on accommodations for educational 200.0 200.0 200A 200.0 250.0 ISO 4.0364 21D MID 61LO solo 24.0 SOLO 60.0 10.0 44A 38.0 88.0 70.0 40A 11,724 6263,866A0 <br /> tou acceptable design aesth-d-, <br /> and construction materials. <br /> Prepareand present final plane <br /> 112 and specifications to City Council 200.0 200.0 200.0 MOO 450.0 4.07 310 2.0 14.0 226.0 80.0 32A 12010 solo 16.0 54.0 92.0 88.0 220.0 44.0 2,348 1113581096A0 <br /> for approval and authorization to <br /> advertise bids. <br /> TMs i-Total W59 Staff Estimated Hour.and 423.0 4170 418.0 420.0 0.0 714.0 4/.0 75.0 117.0 8.0 4- a- 40.0 306.0 160.0 64.0 218A 726A 26A 122.0 130.0 188.0 290,0 92.0 4,434 5696,940.00 <br /> TaW Phase Fee <br /> Prepare aM puhssh adswnieements <br /> tow bid.in ae.rd-with applicable <br /> 2.1 State laws pertaining to competitive 0.6 1.0 2A 4 $44200 <br /> bkts. <br /> 2.2 <br /> Publish end adrainleteradvertiseme 03 <br /> nt. 3.0 4 $W00 <br /> for bide on OueatCDN. <br /> 2.3 Receive and respond to questions 8.0 4.0 4A BA 4,1) 41D 8.0 BID 4.0 12.0 8.0 8.0 16.0 8.0 to 105 s16.02LOD <br /> from ail plan holder.. <br /> 2A Open Bids 110 1.0 1.0 3 s448A0 <br /> s400A0 <br /> 23 Check bids for errors and omiasiom. 1 1,0 <br /> A Proposal for Design,Bidding,and Construction Administration for a <br /> Water Treatment Plant for City of Lino Lakes Proposed Fees(cont.)136 <br />