Laserfiche WebLink
Proposed Fees (cons.) Al <br /> 2 6 Tabulate a8 bids and p-lde t 0 I 2.03 $400.00 <br /> tabula[(on[o the Ch, ! <br /> 2 7 Provide a letter of recommendation for 10 3A 2.06 $916.00 <br /> warding the bid. <br /> Task 2-Total WS8 Staff Estimated Hours and 13A 6.0 4A 0.0 0.0 ILO 7A 4A 0.0 0.0 O.O 0.0 OA 8.0 8.0 4.0 12.0 0.0 6.0 8.0 0.0 16.0 8.0 13.0 127 $19,021.00 <br /> Total Ph a s Fee <br /> t ,. ...... .. ..,, -.., a > .. <br /> 31 Pr pa.and execute contract <br /> ts. 10 2A7 3 <br /> $550.00 <br /> documen <br /> 9.2 Prepare and Issue Notice of Award, 1.0 1 $206.00 <br /> 8.3 Prepare and Issue Notice to Proceed, to 1 $208.00 <br /> __.......____..__......-_.._..._. <br /> Schedule and manage the pre. <br /> 3A construction conference,including 4,0 1.0 2.0 OA 7 $1,252.00 <br /> meeting minutes. <br /> Review shop drawings and other <br /> 3.5 submittals and communicate required 4.0 32.0 102.0 8.0 72.0 18.0 8.0 57.0 297 $45.569.00 <br /> revisions in writing in a timely mentrar. II <br /> 3A Provide conatructionatakin} 40.0 40 $6.240A0 <br /> 37 Revise plane sa needed during 3.0 2.0 40.0 20.0 10.0 4.0 8.0 20.0 2.0 32.0 16.0 6.0 8.0 10.0 10.0 191 $27,494.00 <br /> conetruotlon. <br /> Provide dally construed- <br /> 3A administration and project 30" 5.0 42.0 8.0 440 $91,106A0 <br /> anagement(1 hour par day for 18 <br /> months). <br /> 3.0 IFull time eonatmctbn obserx.tl-for ! <br /> 18 months j 3066A aA 3.074 $460,676.00 <br /> Coordinate and attend monthly <br /> 3.10 construction meetings on•ske with 64A 64.0 18A 4A 3.0 6.0 4.0 141 $24,333A0 ! <br /> epprupdata StnR. <br /> 3.11 Assist with processing partial and final 4.0 20.0 20.0 44 $5.664.00 <br /> payment applications. <br /> Perform final inspection and dewlap/ <br /> 3.12 anege punch list for required B.D 32.0 40.0 12,0 8.0 BA 8.0 so 41D 8.0 132 $20A52A0 <br /> corrective work. <br /> Coordinate plant startup with City <br /> !staff and document all plant startup <br /> !operations including chemical <br /> 3.13 feed rates.HVAC operations, 24,0 BA 60A AID98 $19,152.00 <br /> dehumidification operations, <br /> emergency Power operations,SCADA <br /> integration and operations,etc. <br /> Schedula training for City staff for all3.14 aspects of the WTP. 4.0 4 $680A0 <br /> 335 Complete ea-built survey work. 1.0 32A 33 $6,737.00 <br /> i Pre pare and submit record drawings <br /> in an approved electro,Ic fo,met <br /> 3.16 within six months of construction 40.0 2.08.0 9.0 4.0 4010 2010 8.0 3.0 72.0 4A 150 $10,3621D0 <br /> completion. <br /> Task 3-Total WSB Staff Estimated Hours end 4924 56.0 43A 20A 31 80A 80A ft. 38A 13.0 0.0 CIO OA 72.0 It.... 20A 25,0 165.0 62A 9A 23A 20.0 11. 16.0 32.0 4A82 $731,769A0 <br /> Total Phase Fee <br /> Total Estimated Hours 928A 479A ass. 364D.0 80.0 8020 141A 116.0 /30.0 6A 44A 4.01/2A N2A 197A 93A 386.0 178A A- M. 1- M. 3/8.0 137A 9,223 <br /> Hourly BRIIn9 Rete $208 $145 $145 $150 $206 $162 SM $128. $154 $182 $106 $95 $2D6 $165 $12D $135 $120 $85 $75 $180 $130 $195 1 $ISO so <br /> Total Proposed Fee 81,447,730A0 <br /> A Proposal for Design,Bidding,and Construction Administration for a <br /> Water Treatment Plant for City of Lino Lakes Proposed Fees(cont.)137 <br />