Laserfiche WebLink
Sheet C2.1, Site Plan and Sheet A001, Architectural Site Plan indicate 47 paved parking stalls, <br />2 ADA parking stalls and 12 deferred parking stalls for a total of 61 parking stalls. City Code <br />Section 1007.044(7) details requirements for Parking Deferment. The applicant's narrative <br />details compliance with the parking deferment requirements. <br />The City Engineer is requesting an additional seven (7) ft of road right-of-way be dedicated <br />along 24th Avenue. This would impact the required 15ft parking lot setback for the proposed 12 <br />deferred parking stalls. Staff does not have concerns regarding the reduced setback. First, the <br />City is in the process of updating its zoning ordinance and parking requirements for a <br />commercial daycare are proposed to be changed to 1 space per 300 gross floor area. Applying <br />this standard, New Horizon Academy would only need 40 parking spaces vs. 60. They are <br />proposing 47 spaces which would exceed the minimum requirement. Second, staff does not <br />anticipate the need for the 12 deferred parking stalls. For example, Love to Grow On daycare <br />facility (6499 Lakota Traill was constructed in 2018.The 14,405sf facility is larger than the <br />proposed New Horizon Academy and has not had issues with its existing parking lot. <br />Staff Comment: <br />1. A Parking Deferment Agreement has been drafted by the City and will be recorded <br />against the property. <br />Grading Plan and Stormwater Management <br />Per the Stormwater Management Report prepared by Contour Civil Design dated July 11, 2022, <br />the site has a generally flat topography, with elevations ranging from 920 to 916 EL. Currently, <br />stormwater from the site either drains south to Rosemary Way and ultimately to Clearwater <br />Creek or northwest to an existing wetland located about 170 feet northwest of the parcel, which <br />ultimately drains to Anoka County Ditch 55. <br />Both the daycare facility and extension of Rosemary Way are included in the stormwater <br />analysis. Storm sewer will be used to collect stormwater from the site. The storm sewer will be <br />routed to a new stormwater pond located northwest of the New Horizon Academy parcel on <br />Outlot A. Due to onsite soils consisting of clayey sand and sandy lean clay, infiltration of <br />stormwater is not feasible. Therefore, wet sedimentation basins are proposed to provide the <br />water quality treatment. The stormwater pond will discharge to the existing wetland located <br />about 170 feet northwest of the parcel. The stormwater pond will provide water quality <br />treatment and rate control for the project. Additionally, an irrigation reuse system is proposed <br />to provide volume reduction for the site. <br />The proposed stormwater management facility has been reviewed by the City Engineer and <br />RCWD for compliance for rate control, water quality and volume control. <br />Public Utilities <br />The day care facility will be municipally served by a 27" sanitary sewer main and a 12" <br />watermain located along Rosemary Way. <br />