Laserfiche WebLink
CONTRACTOR TO USE CITY <br />TRAIL TO ACCESS SITE <br />6497 <br />1C. <br />. . . . . . . . . . ........ <br />- — —ry — — — — — — -- PROJECT DESCRIPTION: <br />390 <br />I INSTALL CONSTRUCTION MATS AS DIRECTED FOR ACCESS TO PROJECT <br />AREA (INCIDENTAL). IF THE TRAIL IS DAMAGED DURING CONSTRUCTION, IT <br />WILL BE THE RESPONSIBILITY OF THE CONTRACTOR TO REMOVE THE FULL <br />WIDTH OF THE TRAIL IN THE DAMAGED AREA AND REPLACE WITH NEW <br />TRAIL AS DETAILED IN CITY OF LINO LAKES STANDARD PLATE GEN-9, <br />DATED FEBRUARY 2021. <br />2. EXCAVATE APPROX. 700 CY POND SEDIMENT (PROPERTY OF <br />CONTRACTOR) TO AN AVERAGE POND DEPTH OF 3.0 FT. SEDIMENT TO BE <br />TESTED BY CITY PRIOR TO EXCAVATION. <br />3. RESTORE DISTURBED TURF AREA WITH SOD. <br />4. RESTORE DISTURBED NON -TURF AREAS WITH TOPSOIL, SEED (MNDOT MIX <br />33-261), FERTILIZER TYPE 3, AND CAT. 3N EROSION BLANKET. <br />lopmay. NOTE: COST TO INCLUDE ALL MATERIALS, LABOR, REQUIRED EROSION CONTROL <br />BMP'S AND TRAFFIC CONTROL TO SAFELY PERFORM THE DESCRIBED REPAIR <br />WORK. <br />65 <br />AND DEBRIS FROM <br />18" RC PIPE APROF-7 <br />AND <br />SEDIMENT <br />CLEAR AND GRUBNS. .4 TER <br />9p C <br />TREES AS NEEDED. REEK DRIVE <br />LL <br />6501 <br />6465 <br />TA <br />'IT <br />N <br />A <br />0 30 60 <br />H: MRMI!Mliiiii� <br />SCALE IN FEET <br />m L I <br />SCALE: DESIGN BY: <br />AS SHOWN JN <br />PLAN BY: CHECK BY: <br />KJG DH <br />U) <br />Z o <br />O <br />Ln <br />LU <br />of <br />d <br />SITE 1 <br />CWC-056-A <br />WSB PROJECT NO. <br />019724-000 <br />SHEET <br />OF 3 <br />