Laserfiche WebLink
I I <br />615 <br />4 . <br />/ <br />_ 1 REMOVE AND REPLACE 27" RC PIPE APRON <br />- _ AND TRASH GUARD. CLEAR AND GRUB 4-6 <br />MEW <br />620 <br />/ <br />TREES (+12" IN DIAMENTER) AS NEEDED. <br />FOX ROAD <br />641 <br />1, <br />CONTRACTOR TO USE <br />CITY TRAIL TO <br />ACCESS THE SITE <br />- T <br />A A i i <br />WHITE OWL DRIVE <br />I _ y <br />I <br />I <br />I <br />I; <br />P, <br />6328 <br />el <br />6316 <br />PROJECT DESCRIPTION: <br />1. INSTALL CONSTRUCTION MATS AS DIRECTED FOR ACCESS TO PROJECT <br />AREA (INCIDENTAL). IF THE TRAIL IS DAMAGED DURING CONSTRUCTION, IT <br />WILL BE THE RESPONSIBILITY OF THE CONTRACTOR TO REMOVE THE FULL <br />WIDTH OF THE TRAIL IN THE DAMAGED AREA AND REPLACE WITH NEW <br />TRAIL AS DETAILED IN CITY OF LINO LAKES STANDARD PLATE GEN-9, <br />DATED FEBRUARY 2021. <br />2. EXCAVATE APPROX. 720 CY POND SEDIMENT (PROPERTY OF <br />CONTRACTOR) TO AN AVERAGE POND DEPTH OF 2.0 FT. SEDIMENT TO BE <br />TESTED BY CITY PRIOR TO EXCAVATION. <br />3. RESTORE DISTURBED TURF AREA WITH SOD. <br />4. RESTORE DISTURBED NON -TURF AREAS WITH TOPSOIL, SEED (MNDOT MIX <br />33-261), FERTILIZER TYPE 3, AND CAT. 3N EROSION BLANKET. <br />NOTE: COST TO INCLUDE ALL MATERIALS, LABOR, REQUIRED EROSION CONTROL <br />BMP'S AND TRAFFIC CONTROL TO SAFELY PERFORM THE DESCRIBED REPAIR <br />WORK. <br />0 30 60 <br />H: <br />SCALE IN FEET <br />wsbl <br />SCALE: DESIGN BY: <br />AS SHOWN JN <br />PLAN BY: CHECK BY: <br />KJG DH <br />U z <br />Z s <br />O _ <br />U) <br />w <br />G= <br />SITE 2 - <br />RES-015-A <br />Z <br />2 <br />C <br />W <br />Q <br />J <br />Z <br />J <br />WSB PROJECT NO. <br />019724-000 <br />SHEET <br />2 OF 3 <br />