My WebLink
|
Help
|
About
|
Sign Out
Home
Search
10-03-2022 Council Work Session Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2022
>
Searchable Packets
>
10-03-2022 Council Work Session Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2022 9:10:12 AM
Creation date
12/12/2022 2:13:03 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
10/03/2022
Council Meeting Type
Work Session Special
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
382
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />22 <br /> <br />Response: <br />• The public drainage system and most of the private drainage system on site will remain <br />the same. The proposed development is required to meet the stormwater runoff quality <br />and quantity requirements of the City of Lino Lakes, Rice Creek Watershed District, and <br />the MPCA National Pollutant Discharge and State Disposal System (NPDES/SDS). <br />Therefore, the stormwater basins on site will be designed to meet these requirements. <br />Additionally, since the site falls within the 100 year floodplain, the development is <br />required to follow the Rice Creek Watershed District floodplain mitigation requirements <br />and implement on-site floodplain mitigation. These requirements will aide in controlling <br />drainage on site to avoid impacts to the surrounding area. <br />• Alliant Engineering has prepared the required floodplain calculations and models for the <br />proposed floodplain mitigation on site per Rice Creek Watershed requirements and <br />submitted this to Rice Creek Watershed District for review and approval. Additionally, <br />Alliant has prepared the required stormwater calculations for the site per Rice Creek <br />Watershed District regulations. This has been sent to Rice Creek Watershed District for <br />review and approval. All stormwater and floodplain calculations and design will be <br />subject to review and approval by the City Engineer, consistent with City requirements, <br />as part of the rezoning and preliminary plat review. <br />4.2.15 Reilly Anderson – September 15, 2022 <br />Comment. Reilly states that he has concern and is opposed to the proposed development. <br />These concerns include: <br />• The proposed housing development threatens to further fragment the habitats of birds and <br />other wildlife within Anoka County and will add new stressors to the local environment. <br />• As summer weather becomes increasingly extreme and unpredictable, newly constructed <br />impervious surfaces will further stress the local aging drainage systems, threatening the <br />homes and properties of existing area residents with flooding, many of which were built <br />many years ago. <br />• There is concern that the proposed new roads and feeder routes will be ineffective in <br />mitigating the existing traffic issues in the area. The addition of the proposed high density <br />housing will add a critical amount of new motor traffic that will exceed the local <br />infrastructure’s ability to provide safe streets. <br />Response: <br />• The current conditions of the site include the use of agriculture fertilizers, a <br />monoculture of sod grass, and a private and public drainage system. The proposed <br />development is expected to add open water features that currently do not exist on site <br />and to plant native vegetation throughout the site. The open water areas can provide fly <br />over habitat for migratory and local waterfowl and the native vegetation can provide
The URL can be used to link to this page
Your browser does not support the video tag.