Laserfiche WebLink
determine improvements needed to resolve deficiencies. This plan must <br />determine traffic generated by the subdivision project, how this traffic <br />contributes to the total traffic, and the time frame of the improvements. The <br />plan also must examine financing options, including project contribution and <br />cost sharing among other jurisdictions and other properties that contribute to <br />traffic at the interchange. <br />8. The City does not relinquish any rights of local determination. <br />The traffic generated by the proposed retail development are within the capabilities of <br />the streets serving the property and meet LOS requirements. The City will not relinquish <br />any rights of local determination. <br />(e) The proposed development shall be served with adequate and safe water supply. <br />The proposed development will be served with adequate and safe water supply. <br />(f) The proposed development shall be served with an adequate or safe sanitary sewer <br />system. <br />The proposed development will be served with adequate and safe sanitary sewer. <br />(g) The proposed development shall not result in the premature expenditures of City <br />funds on capital improvements necessary to accommodate the proposed <br />development. <br />No City funds are being expended for this development. <br />(h) Development shall be permitted only in such a manner that the maximum number of <br />trees shall be preserved. It shall be the duty of the person seeking approval to <br />demonstrate that there are no feasible or prudent alternatives to the cutting of trees <br />on the site. <br />The proposed retail development does not propose any tree removal. There are no trees <br />on site. <br />BE IT FURTHER RESOLVED by The City Council of the City of Lino Lakes hereby <br />approves the site and building plan for 601 Apollo Drive Retail subject to the following <br />conditions: <br />1. The subject site shall be developed in accordance with the following plans <br />including subsequent revisions: <br />a. Site and Civil Plans prepared by Design Tree revision date September 21, <br />2022 <br />b. Architectural Plans prepared by Lampert Architects revised September 28, <br />2022 <br />c. Landscape Plans prepared by Plan -Type revision date September 29, 2022 <br />