Laserfiche WebLink
BID TABULATION SUMMARY <br />PROJECT: <br />2022 135E Pipe Crossing Project <br />OWNER: <br />City of Lino Lakes <br />WSB PROJECT NO.: <br />019485-000 <br />Bids Opened: Wednesday, October 5, 2022, at 10:30 am <br />Bid <br />ALTERNAT 1 <br />ALTERNAT 2 <br />Security <br />Steel <br />Concrete <br />BASE BID AND <br />BASE BID AND <br />Contractor <br />(5%) <br />BASE BID <br />Pipe Jacking <br />Pipe Jacking <br />ALTERNATE 1 <br />ALTERNATE 2 <br />1 Minger Construction Co., Inc. <br />x <br />$142,827.80 <br />$505,050.00 <br />$370,100.00 <br />$647,877.80 <br />$512,927.80 <br />2 New Look Contracting, Inc. <br />x <br />$126,808.50 <br />$608,700.00 <br />$456,950.00 <br />$735,508.50 <br />$583,758.50 <br />3 Meyer Contracting, Inc. <br />x <br />$359,470.98 <br />$770,509.98 <br />$573,724.44 <br />$1,129,980.96 <br />$933,195.42 <br />Engineer's Opinion of Cost <br />$198,819.50 <br />$604,000.00 <br />$342,700.00 <br />$802,819.50 <br />$541,519.50 <br />1 hereby certify that this is a true and correct tabulation of the bids as received on October 5, 2022. <br />Diane Hankee, PE Project Manager <br />Denotes corrected figure <br />K:1019485-OOOI4dminlConstruction AdminlBiddingIO19485-000 Bid Summary 100522 <br />