Laserfiche WebLink
2021 Street Improvement Projects Final Pay Voucher 12 <br /> <br /> Page 10 of 10 <br />Contract Change Totals <br />No. Contract <br />Change Description Amount This <br />Voucher <br />Amount To <br />Date <br />contamination from the underneath soil that will be piled up during <br />watermain work. It has also been decided that increasing the aggregate <br />base section to 7.5" is favorable to help prolong the life expectancy of <br />the roadway. Excavation of 3"-5" to the existing sand section is now <br />necessary to accommodate the new increased aggregate base section. <br />Included in the work, the Contractor shall provide 1400 CY of reclaim <br />material to the Tower Park location. <br /> <br />The Engineer in concurrence with the City of Lino lakes, have agreed <br />that adding in two 6" gate valves is necessary to help control watermain <br />shut down areas. <br /> <br />This work will be considered "Contract Revisions" as provided for <br />Specification 1402. Payment for this work will be a contract prices and <br />negotiated prices. <br /> <br /> <br />Material On Hand Additions <br />Line <br />No. Item Description Date Added Comments <br /> <br /> <br />Material On Hand Balance <br />Line <br />No. Item Description Date Added Used Remaining <br /> <br />