Laserfiche WebLink
Pavement Management Report <br />P a g e | 3 <br /> <br /> <br /> <br />Compared to 2021 when a similar report was issued, the average PCI in the City has changed <br />from 73.6 to 75.5. Table 1 shows how the area weighted average PCI in Lino Lakes has <br />changed over the past five years. These records show the maintenance and construction <br />performed by the City have maintained the network in relatively stable condition. Additionally, <br />the last two years have seen the PCI increase, which is also due to the City adding new roads <br />to the system. Table 2 shows the mileage of pavement in each category. <br />Table 1. Historical Pavement Conditions in Lino Lakes <br /> <br /> <br />Table 2. Pavement Conditions Mileage Breakdown <br /> 2022 2021 <br />PCI Category PCI Range Mileage <br />Percent of <br />Roadway <br />Network by <br />Area <br />Mileage <br />Percent of <br />Roadway <br />Network by <br />Area <br />Adequate 70.01 – <br />100.00 71.4 69.8 68.3 68.1 <br />Marginal 40.01 – <br />70.00 24.9 23.0 23.7 21.6 <br />Problem 0 – 40.00 8.4 7.2 12.2 10.3 <br /> <br />For sections of pavement that fall into the Adequate category, corrective and preventative <br />maintenance is recommended. Corrective maintenance includes crack sealing and patching. <br />These types of maintenance should be conducted as soon as cracks or distresses surface to <br />reduce the infiltration of water and incompressible materials through the cracks. These fixes are <br />recommended on roads in the upper range of the Adequate category because those roads <br />should not need any major repairs. Preventive maintenance includes surface treatment such as <br />crack sealing, fog sealing, and rejuvenating. These maintenance activities should be performed <br />while the pavement is still in good condition. As roads deteriorate, these cost-effective <br />maintenance strategies become ineffective and more expensive fixes are required. With proper <br />preventative maintenance techniques, the life of an average paved road increases from 20 <br />years to 50 years. Each type of preventive maintenance serves its own function, and project <br />selection depends on the type and severity of distresses observed in the road. A more detailed <br />evaluation of each road is required to accurately determine the proper maintenance strategy. <br />2022 Inspection 2021 Inspection 2020 Inspection 2019 Inspection 2018 Inspection <br />Adequate 70.01-100.00 69.8%68.2%65.0%66.5%63.9% <br />Marginal 40.01-70.00 23.0%21.4%20.3%19.8%22.2% <br />Problem 0.00-40.00 7.2%10.4%14.6%13.7%13.9% <br />75.5 73.6 71.0 71.0 71.4 <br />Historical Pavement Conditions <br />Condition PCI Range Percent of Roadway Network by Area <br />Weighted Average PCI