Laserfiche WebLink
7 <br /> <br />(f) The proposed development shall be served with an adequate or safe sanitary <br />sewer system. <br /> <br /> The proposed earth moving and stockpiling does not require service by sanitary <br />sewer. Municipal sanitary sewer is located along is located along Phelps Road and can <br />be extended to the property should the applicant wish to connect in the future. <br /> <br />(g) The proposed development shall not result in the premature expenditures of <br />City funds on capital improvements necessary to accommodate the proposed development. <br /> <br />The proposed earth moving and stockpiling operation will not expend City funds. <br /> <br />(h) Fire prevention and fighting equipment acceptable to the Board of Fire <br />Underwriters and City Council shall be readily available when any activity involving the <br />handling or storage of flammable or explosive materials is carried on. <br /> <br />The proposed earth moving and stockpiling operation does not involve any activity <br />handling or storing flammable or explosive materials. <br /> <br />In addition to the criteria established under Section 1007.017, Interim Use Permits, <br />Section 1007.051(4), Earth Moving and Land Reclamation establishes the following <br />conditions that shall be met: <br /> <br />(a) Properly fence any pit or excavation, and barricade entrances to prevent <br />the general public from depositing garbage or refuse. <br /> <br />The proposed plans indicate earth moving for stockpiling, not a pit. The proposed plans <br />do not currently show any fencing around the earth moving areas or any barricades at <br />the entrance, other than silt fence. <br /> <br />(b) Slope the banks, and otherwise guard and keep any pit or excavation in <br />such condition as not to be dangerous because of sliding or caving banks. <br /> <br />The fill stockpiles are proposed with 4:1 side slopes on all sides, reducing the risk of <br />sliding or caving banks. Areas not being worked shall be established with turf within <br />seven (7) days of placement to avoid sliding. <br /> <br />(c) Properly drain, fill, or level off any pit or excavation so as to make the <br />same safe and healthful as the City may determine. <br /> <br />The proposed earth moving and stockpiling site is designed to drain in a similar manner <br />as the existing conditions. The majority of the site will drain towards the existing <br />wetlands and Clearwater Creek. Erosion control is proposed and will be needed to <br />ensure that sediment is prevented from entering the wetlands and Clearwater Creek. <br />