Laserfiche WebLink
Serving Minnesota, Wisconsin, Iowa, <br />Nebraska, North Dakota, and South Dakota <br /> <br />3017 161st Ave NW, Andover, MN 55304 <br />763-753-1127 – Phone <br />763-753-3619 – Fax <br />eric@umathleticconstruction.com <br /> <br />MN Contractors No. IR722325 <br />IA Contractors No. C090307 <br /> <br /> <br />February 10, 2023 <br /> <br />City of Lino Lakes <br />600 Town Center Parkway <br />Lino Lakes, MN 55014 <br /> <br />RE: City Hall Park Pickleball Courts <br /> <br />We propose the following: <br /> <br />Pickleball/Basketball Court Reconstruction – 80’X60’ <br />1. Add additional Class 5 aggregate base as needed <br />2. Shape and compact existing aggregate base <br />3. Furnish and install a 1.5” compacted thickness MN/DOT SPNWB230B base course <br />4. Furnish and install a MN/DOT 2357 tack coat <br />5. Furnish and install a 1.5” compacted thickness MN/DOT SPWEA240B-Virgin wear course <br />a. Final cross slope will be between 1-2 percent <br />b. 28-day cure time after wear course is paved prior to acrylic coating <br />6. Furnish and install one (1) Goalsetter MVP basketball standard <br />a. Concrete net post foundations 24”X60” <br />b. 4,000 PSI exterior concrete <br />7. Furnish and install two (2) sets of Douglas pickleball net posts, nets and center tie down anchors <br />a. Concrete foundations 18”X60” <br />b. Concrete tie down foundations 12”X60” <br />c. 4,000 PSI exterior concrete <br />8. Furnish and install topsoil and seed to disturbed areas as needed <br />9. Saw cut expansion joint at mid court between pickleball and basketball 1.5” deep and fill with elastomeric crack filler <br />10. Fill birdbaths with crack patch binder to level of existing surface with multiple applications and grind smooth <br />11. Apply two coats of sand filled NuSurf acrylic resurfacer <br />a. 8-10 lbs. silica sand added per gallon of concentrate material <br />b. Coverage: .05-.07 gallons per square yard per coat <br />12. Apply two coats of sand filled ColorFlex acrylic paint <br />a. Color to be selected by owner <br />b. 6 lbs. silica sand added per gallon of concentrate material <br />c. Coverage: .05 gallons per square yard per coat <br />13. Reline per NFHS and USAPA standards <br /> Total $42,141 <br /> <br /> <br />Notes: <br />All above is furnished and installed complete <br />Pricing reflects 2023 construction season and would need to be updated for 2024 <br />Does not include removal of existing bituminous, permits if required, private locates, irrigation, soil corrections or watering <br />Quote is based on use of Sourcewell cooperative purchasing agreement <br />Sourcewell contract 060518-AST <br /> <br /> <br />Thank you, <br /> <br />Eric Hicks <br />Upper Midwest Athletic Construction, Inc.