My WebLink
|
Help
|
About
|
Sign Out
Home
Search
03-06-2023 Park Board Packet
LinoLakes
>
Advisory Boards & Commissions
>
Park Board
>
Park Board Meeting Packets
>
2023 Park Board Packets
>
03-06-2023 Park Board Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2023 3:18:18 PM
Creation date
3/1/2023 10:06:38 AM
Metadata
Fields
Template:
Park Board
Park Bd Document Type
Park Board Packet
Meeting Date
03/06/2023
Park Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> <br />DATE: March 6, 2023 <br /> <br />TO: Park Board Members <br /> <br />FROM: Rick DeGardner, Public Services Director <br /> <br />RE: 2023 Parks and Trails Fund Update <br /> <br /> <br />The City Council approved the following projects utilizing Park and Trail Improvement Funds: <br /> <br />o Replace Brandywood Park Playground Equipment (installed in 2000) <br />o Replace Birchwood Acres Park Playground Equipment (installed in 1996) <br />o Repurpose the bituminous pad at City Hall Park for 2 pickleball courts, and possibly <br />½ court basketball court <br /> <br />Each playground equipment replacement project includes $70,000 for equipment and up to <br />$25,000 for play container edging and engineered wood fiber. <br /> <br />The estimated project cost for the pickleball courts was $25,000. This was assuming the existing <br />bituminous pad was in sufficient condition to provide a decent base. Upon closer inspection, it’s <br />been determined that existing material should be removed and replaced with additional aggregate <br />base, 1.5-inch base course, and 1.5-inch wear course. Total project cost amounts to approximately <br />$42,000. This includes painting, striping, two sets of pickleball posts and nets, and a Goalsetter <br />MVP basketball standard. A bid from Upper Midwest Athletic Construction is attached. <br /> <br />Does the Park Board still want to proceed with the two pickleball courts and ½ court basketball <br />project at City Hall Park in 2023? <br /> <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.