My WebLink
|
Help
|
About
|
Sign Out
Home
Search
03-27-2023 City Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2023
>
Searchable Packets
>
03-27-2023 City Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2023 3:28:33 PM
Creation date
3/30/2023 3:17:30 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
03/27/2023
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 <br /> <br /> <br />• Conditional Use Permit Amendment <br />• Site and Building Plan Review <br /> <br />This staff report is based on the followings plan sets: <br /> <br />• Boundary Survey prepared by Sunde Land Surveying dated February 9, 2023 <br />• Civil Plan Set prepared by Larson Engineering, Inc. dated March 14, 2023 <br />• Parking Lot Cross Section of Parking Lot prepared by Larson Engineering, Inc. dated <br />March 14, 2023 <br />• Stormwater Calculations prepared by Larson Engineering, Inc. revised March 20, 2023 <br />• Geotechnical Evaluation Report prepared by Braun Intertec dated December 22, 2022 <br /> <br />This Council staff report provides edits to the March 8, 2022 Planning & Zoning staff report. <br />Changes are either narratively described or shown as strikethrough (deletions) or underline <br />(additions). <br /> <br />ANALYSIS <br /> <br />Background <br /> <br />The Centennial Middle School was constructed in 1997. The project will include the <br />construction of a new parking lot at the location of the existing tennis courts on the south side <br />of the school. Eight (8) new tennis courts will be constructed in the existing parking lot located <br />southeast of the school. The tennis courts will also be striped for pickleball. A stormwater <br />management basin will be constructed on the west side of the new parking lot. <br /> <br />Existing Site Conditions <br /> <br />The existing site contains the Centennial Middle School, Blue Heron Elementary School and <br />associated parking lot and athletic fields. <br /> <br />Per the Geotechnical Evaluation Report prepared by Braun Intertec, dated December 22, 2022, <br />native soils in the area consist of very fine-to medium-grained sand. Groundwater was not <br />observed at 11 foot boring depths. <br /> <br />Zoning and Land Use <br /> <br />The property is zoned PSP, Public and Semi-Public and allows for schools with a conditional <br />use permit. <br /> <br />Current Zoning PSP, Public and Semi-Public <br />Current Land Use Public School <br />Future Land Use per CP Civic/Institutional <br />Utility Staging Area 1A=2018-2025
The URL can be used to link to this page
Your browser does not support the video tag.