My WebLink
|
Help
|
About
|
Sign Out
Home
Search
05-08-2023 City Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2023
>
Searchable Packets
>
05-08-2023 City Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2023 1:21:17 PM
Creation date
5/12/2023 4:07:18 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
05/08/2023
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
\\wsbgvfiles01\resources\.Clients All\Lino Lakes\Proposals\Winters Wetland <br />Bank\PROPOSAL_WintersWetlandBank_ProspectusDataCollection_050323.docx <br />that can greatly influence the design and viability of the project. WSB staff will <br />submit for review under both these programs. <br />5. Completing an existing vegetation survey/ENRV existing veg releve survey <br />will be needed to characterize the vegetative community and determine the <br />floristic quality and abundance of invasive species to quantitatively show <br />“functional lift” with respect to both wetland and upland vegetation. Under this <br />task, a whole site general vegetation survey will be completed and a focused <br />survey on the spruce swamp in the Northwest corner of the project area to <br />determine if this area will qualify for exceptional natural resource value (ENRV) <br />credit. <br />6.The last data collection activity under this scope will be hydrology monitoring <br />through the installation of stilling wells and water level loggers. This is a critical <br />component of the project which can be used to determine the type and amount of <br />wetland credit that may be realized through full or partial restoration of wetland <br />hydrology and will influence the hydrologic and hydraulic analysis and final <br />design. Under this task, WSB will install seven (7) wells across the project site to <br />monitor them for a period of five (5) months (May through September 2023). <br />Phase 1 Project Schedule <br />Project <br />Element <br />May June July August September <br />Task 1 <br />Task 2 <br />Task 3 <br />Task 4 <br />Task 5 <br />Task 6 <br />This schedule assumes that this proposal is accepted by Mid-May to allow for the <br />installation of monitoring wells. <br />Phase 1 Project Budget <br />Project Element Cost <br />Task 1 $4,754 <br />Task 2 $3,294 <br />Task 3 $8,032 <br />Task 4 $428 <br />Task 5 $9,618 <br />Task 6 $6,116 <br />Purchase Data Loggers $1,500 <br />Project Total $33,742
The URL can be used to link to this page
Your browser does not support the video tag.