My WebLink
|
Help
|
About
|
Sign Out
Home
Search
05-08-2023 City Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2023
>
Searchable Packets
>
05-08-2023 City Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2023 1:21:17 PM
Creation date
5/12/2023 4:07:18 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
05/08/2023
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />\\wsbgvfiles01\resources\.Clients All\Lino Lakes\Proposals\Winters Wetland <br />Bank\PROPOSAL_WintersWetlandBank_ProspectusDataCollection_050323.docx <br />This Phase 1 project total Tasks 1-6 ($32,242) represents a total to be billed hourly and <br />not to exceed unless authorized by the City of Lino Lakes. <br /> <br />Phase 2 project tasks include: <br /> <br />7. Onsite TEP/IRT Review Meeting <br />8. CAD Based Concept Plans (60%) <br />9. Draft Conservation Easement Description/Title Review/Exhibit <br />10. Archeological Phase I Assessment <br />11. Hydrologic and Hydraulic Analysis <br />12. Prospectus Document Report and Application Submittal <br />13. Project Management <br /> <br />Under task 11, WSB staff will model existing site hydrology and model proposed bank <br />design alternatives to determine if hydrology can be maintained to meet performance <br />standards while effectively moving excess water downstream so as not to negatively <br />impact adjacent properties and infrastructure. <br /> <br />Task 7 will be scheduled with the TEP once data analysis is complete to provide <br />additional context for discussion with the TEP on site while reviewing various design <br />alternatives to develop the wetland bank. <br /> <br />Documents created under tasks 8-10 will be included with the prospectus submittal <br />identified in task 12 to make a complete prospectus submittal. <br /> <br />Project Management includes time for WSB to respond to comments, support city staff, <br />and ensure that prospectus review/comments are finalized and provided to the City and <br />to prepare for development of the mitigation bank instrument (MBI). <br /> <br />Phase 2 Project Schedule <br /> <br />Project <br />Element <br />July August September October November December <br />Task 7 <br />Task 8 <br />Task 9 <br />Task 10 <br />Task 11 <br />Task 12 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.