My WebLink
|
Help
|
About
|
Sign Out
Home
Search
06/14/2023 P & Z Combined Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2023
>
06/14/2023 P & Z Combined Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2023 8:08:47 AM
Creation date
6/8/2023 4:28:26 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
06/14/2023
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br /> <br />Color packages and anti-monotony plans will be included with each building permit application <br />to ensure that the homes elevations are varied with a minimum of five different styles and those <br />homes in proximity to each other not look alike in terms of the combination of color of siding, <br />accent and roofing materials. Coventry by Alside vinyl siding with .042β panel thickness is <br />proposed on all the housing units. All houses have minimum 4β window trim on the side and <br />rear elevations to meet resolution requirements to incorporate an architectural feature into those <br />elevations that are visible from 20th Avenue (CSAH 54), 21st Avenue N. and the public park. <br /> <br />In summary, the Watermark 6th Addition single family housing types and products meet the <br />architectural design standards requirements of Resolution No. 17-133 and Resolution No. 19- <br />131. <br /> <br />HOA Clubhouse <br /> <br />Lot 1, Block 3, Watermark 4th Addition was platted for the future construction of the HOA <br />clubhouse. Per the Master Development Agreement, the developer shall construct a private club <br />house for the use of the residents of the Development once final plat approval for 518 lots has <br />been granted by the City. With the approval of the 5th addition final plat, there were 613 <br />approved lots. <br /> <br />Per the 5th Addition Development Agreement, βThe Watermark HOA clubhouse and related site <br />improvements shall be completed and operating prior to Council approval of Watermark 6th <br />Addition PUD Final Plan/Final Plat.β Site and architectural plans for the clubhouse have been <br />approved and the building permit has been issued. Construction started in May 2023 and should <br />be completed by late Fall. Staff will evaluate progress on the clubhouse construction before <br />presenting the 6th Addition PUD Final Plan/Final Plat to City Council for consideration. <br /> <br />Subdivision Ordinance <br /> <br />Conformity with the Comprehensive Plan and Zoning Code <br /> <br />The Watermark 6th Addition final plat has been reviewed for compliance with the comprehensive <br />plan, zoning and subdivision ordinance. The proposed final plat meets the performance <br />standards of the subdivision and zoning ordinance and is consistent with the PUD Development <br />Stage Plan/Preliminary Plat and Final Plan. <br /> <br />Plat Phases <br /> <br />The following summarizes the number of lots platted per addition: <br /> <br />Addition # SF Lots <br />Remaining <br />#SF Lots # TH Lots <br />Remaining <br />#TH Lots <br />Total # Lots <br />Remaining <br /> 692 172 864 <br />1st 100 592 93 79 671
The URL can be used to link to this page
Your browser does not support the video tag.