My WebLink
|
Help
|
About
|
Sign Out
Home
Search
06/14/2023 P & Z Combined Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2023
>
06/14/2023 P & Z Combined Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2023 8:08:47 AM
Creation date
6/8/2023 4:28:26 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
06/14/2023
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 <br />2nd 57 535 0 79 614 <br />3rd 96 439 79 0 439 <br />4th 91 348 0 0 348 <br />5th 97 251 0 0 251 <br />6th 48 203 0 0 203 <br />Blocks and Lots <br />The final plat creates 48 single family lots and 2 outlots. The following chart summarizes the <br />purpose of the outlot: <br />Outlot Purpose Ownership <br />A Future Development, Wetland, Open <br />Space and Trail Corridor Future HOA <br />B Wetland and Open Space HOA <br />All outlots will be deeded, owned, and maintained by a Homeowners Association (HOA). <br />Easements <br />Standard drainage and utility easements are being dedicated on individual lots and over Outlot B. <br />Street and Utilities <br />The 6th Addition proposes construction of the following streets which are consistent with the <br />PUD Development Stage Plan: <br />Street Name Right-of-Way Width Street Width <br />(Back to Back) <br />Norway Lane, <br />Osakis Street 60 feet 32 feet <br />Victoria Circle 60 feet 30 feet <br />Rainy Lane 66 feet 36 feet <br />Northbound and southbound right turn lanes on CSAH 54 (20th Avenue N) at Rainy Lane are <br />shown on the turning lane construction plans. Anoka County Highway Department is also <br />requiring a southbound left turn lane. Plans shall be revised accordingly. <br />Watermain, sanitary sewer main, stormwater facilities, streets, sidewalks and trails are being <br />constructed consistent with the PUD Development Stage Plan.
The URL can be used to link to this page
Your browser does not support the video tag.