My WebLink
|
Help
|
About
|
Sign Out
Home
Search
06/14/2023 P & Z Combined Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2023
>
06/14/2023 P & Z Combined Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2023 8:08:47 AM
Creation date
6/8/2023 4:28:26 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
06/14/2023
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 <br />The north 150 acres of the Watermark development is located in Utility Staging Area 1B (2025- <br />2030). A portion of Watermark 5th Addition and 6th Addition is within this utility staging area. <br />The City Council shall pass a resolution to allow the development to occur early in a 10-year <br />staging area. <br />Public Land Dedication and Fees <br />As approved with Resolution No. 16-51, the City will require the following combination of land <br />dedication and cash in lieu of land dedications: <br />1. Land dedication for the public and private parks will be credited from the total payment <br />in lieu. <br />2. Costs for public park improvements and trail construction will be credited from the total <br />payment in lieu. <br />3. Improvements to the private parks and recreational center will not be credited from the <br />total payment in lieu. <br />An 8.5 ft wide bituminous trail approximately 1,250lf in length will be constructed in the road <br />right-of-way along 20th Avenue, Rainy Lane and into Outlot B. A Permanent Trail Easement <br />over the trail section on Outlot B is required. The easement and exhibit shall be drafted and <br />recorded after the trail has been constructed to ensure the trail is within the easement. Trail <br />construction costs will be credited. No land is being dedicated in the 6th Addition. <br />The following is a summary of the public land dedication and fees: <br />Watermark 6th Addition <br />Total # Units = 48 <br />x Park Dedication Fee $3,300 <br />= Cash in Lieu Value $158,400 <br />- Trail Construction Costs ($37,500) <br />TOTAL CASH FEE DUE = $120,900 <br />Plans and specs for Watermark Park are complete and construction is scheduled for Spring 2023 <br />with substantial completion by Fall 2023. <br />Wetlands <br />Wetland delineations were approved by RCWD and USACE in 2015. The delineation identified <br />28 wetlands totaling approximately 20 acres in size. The original approved WCA Sequencing
The URL can be used to link to this page
Your browser does not support the video tag.