Laserfiche WebLink
Ms. Katie Larsen <br />07/28/2023 <br />Page 4 <br />Milestones Addition & Lil Explorers Childcare Center Engineering Review <br />(5/19/23) Adjusted in new design <br />17.(5/19/23) Applicant to revise storm sewer to comply with City minimum pipe <br />diameter of 15”. <br />Water Supply <br />There is existing 12-inch diameter ductile iron pipe (DIP) water main along Apollo Drive <br />(CSAH 12) and two separate 4-inch diameter DIP water stubs extend to the property. <br />The applicant is proposing to connect into the water main along Apollo Drive (CSAH 12) <br />and extend 8-inch diameter DIP through the site. There are proposed 6-inch diameter <br />DIP service stubs to the childcare property and the future bui ldings. <br />Comments: <br />1.(5/3/2023) The 8-inch diameter DIP and any fittings or connections to the water <br />main shall conform to City of Lino Lakes Standard Specifications and CEAM <br />standards (current versions). <br />(5/19/23) There is a note on the plans indicating this <br />2.(5/3/2023) Applicant shall extend the 8-inch diameter DIP to the right-of-way of <br />Lilac Street. <br />(5/19/23) extended <br />(5/19/23) In coordination with the fire department , the applicant shall move the <br />southerly hydrant to the end of the 8 inch diameter mainline water at Lilac Street. <br />The mainline with hydrant shall end near the easement line, north of the culvert <br />and powerline. <br />3.(5/3/2023) Applicant to revise the location of the Fire Department Connection <br />(FDC) so that it accessible and not within a fenced in play area. Applicant to verify <br />that a hydrant is within 100 ft of the new FDC location and accessible from the <br />parking lot being installed with the Lil Explorers site improvements . Revisions to the <br />FDC location and hydrant location should be approved by Deputy Director of Public <br />Safety – Fire Division, Dan L’Allier. <br />(5/19/23) FDC moved out of play area Hydrant clearly shown within 100 feet of <br />FDC <br />4.(5/3/2023) Applicant shall connect to existing water main in Apollo Drive (CSAH 12) <br />via a wet tap. <br />(5/19/23) Note added <br />5.(5/3/2023) Applicant to revise location of the curb stop. The curb stop shall be in an <br />area that is accessible to City Public Works staff and shall be within an easement <br />that is contiguous with the easement over the 8-inch diameter water main (see <br />comment 1 under the Drainage and Utility Easements section). <br />(5/19/23) Curb stop moved closer to 8” main. Will be in future drive aisle of parking <br />lot. <br />6.(5/3/2023) Applicant is responsible for verifying water suppression needs for the <br />building. <br />(5/19/23) To be addressed by others <br />Sanitary Sewer <br />There is existing 21-inch diameter polyvinyl chloride (PVC) sanitary sewer located along <br />Apollo Drive (CSAH 12) and two separate 6-inch diameter PVC water stubs extend to the <br />property.