Laserfiche WebLink
Ms. Katie Larsen <br />09/27/2023 <br />Page 4 <br />Glamos Wire Storage Expansion Engineering Review <br />Landscaping plans were provided as part of the submittal. The City’s Environmental <br />Coordinator to review landscaping and provide in-depth comments. <br /> <br /> <br />• Floodplain <br /> <br />No floodplain impacts are proposed on site. RCWD to review whether RCWD floodplains <br />are impacted with the project. <br /> <br /> <br />• Drainage and Utility Easements <br /> <br />Drainage and utility easements are required over stormwater management areas (pipe and <br />basin). <br />(BM 9/21/2023) Drainage and utility easements over stormwater management areas have <br />been drafted. <br />(WSB 9/27/2023) Please provide final easements when available. <br /> <br />• Development Agreement <br /> <br />A Development Agreement is not applicable for this application. <br /> <br /> <br />• Grading Agreement <br /> <br />A Grading Agreement is not applicable for this application. <br /> <br />• Stormwater Maintenance Agreement <br /> <br />The stormwater facilities will be privately maintained, and a Declaration for Maintenance of <br />Stormwater Facilities will be required. Both the Rice Creek Watershed District (RCWD) and <br />the City of Lino Lakes shall be parties to the Declaration. <br /> <br />(BM 9/21/2023) A Declaration for maintenance of stormwater facilities has been drafted. <br /> (WSB 9/27/2023) Please provide final maintenance agreement when available. <br /> <br /> <br /> <br />• Permits Required <br /> <br />1. NPDES General Construction Permit <br />2. City of Lino Lakes Zoning Permit for construction <br />3. Rice Creek Watershed Permit <br /> <br />(BM 9/21/2023) Acknowledged. Tomas Companies will submit an application for the <br />NPDES Construction Stormwater Permit and for the City of Lino Lakes Zoning Permit. The <br />Rice Creek Watershed has issued a permit with conditional approval. <br />