My WebLink
|
Help
|
About
|
Sign Out
Home
Search
10-09-2023 Council Meeting Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2023
>
Searchable Packets
>
10-09-2023 Council Meeting Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/9/2023 5:22:41 PM
Creation date
10/9/2023 4:22:27 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
10/09/2023
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />\\metro-inet\linolakes\Shared\Community Development\Projects\Capital Improvement Projects\2024 Mill and Overlay\Staff <br />Reports\20231009 CC Authorize Plans and Spec\3. WSB Design Proposal.docx 701 XENIA AVENUE S | SUITE 300 | MINNEAPOLIS, MN | 55416 | 763.541.4800 | WSBENG.COM October 3, 2023 <br /> <br /> <br />City of Lino Lakes <br />Mr. Michael Grochala <br />600 Town Center Parkway <br />Lino Lakes, MN 55014 <br /> <br />Re: Proposal to Complete 2024 Mill and Overlay Street Project and Trunk <br />Watermain Project Construction Plans and Specifications <br /> <br />Dear Mr. Grochala: <br /> <br />WSB LLC. is providing this proposal for the design and bidding services for the 2024 Mill <br />and Overlay Streets and Trunk Watermain Project. The local streets designated for <br />rehabilitation were determined by their OCI ratings established in the City’s Pavement <br />Management Study, and the scope verified by cores. A summary of the project scope is <br />described as follows: <br /> <br />Mill and Overlay (approximately 1.7 miles) – Black Duck Circle (from Black Duck <br />Drive to cul-de-sac), Black Duck Drive (from Black Duck Circle to Birch Street), <br />Black Duck Court (from Black Duck Drive to cul-de-sac), Aspen Lane (from Killdeer <br />Drive to cul-de-sac), Beaver Circle (from Deerwood Lane to cul-de-sac), Deerwood <br />Circle (from Deerwood Lane to cul-de-sac), Deerwood Lane (cul-de-sac), Linda <br />Lane (from Hodgson Road to 62nd St Trail Crossing), Linda Court (from Linda Lane <br />to cul-de-sac), and Linda Circle (from Linda Lane to cul-de-sac), and Linda Ave <br />(from Linda Lane to Ware Road). <br /> <br />Aspen Lane will be bid and alternate to meet project budgets. The project scope also <br />includes curb and gutter replacement as necessary and gate valves will be replaced if <br />they have not been previously repaired. On Black Duck Drive between E Shadow Lake <br />Dr and Lantern Ln, there is an existing 6” watermain section and an existing 8” <br />watermain section that is identified as Trunk Watermain in the Capital Improvement <br />Plan. These two sections of watermain will be upgraded by installing a 12” diameter <br />watermain parallel to the existing 6” and 8” watermain. On Black Duck Drive from <br />approximately Lantern Lane to the south side of Birch Street there is an existing 10” raw <br />water line will be upgraded to a 16” raw watermain as a trunk water system <br />improvement. Public Works is also identifying miscellaneous storm sewer improvements <br />that may be needed throughout the project area. Based on the project scope, WSB <br />would perform the following tasks: <br /> <br />I. Prepare Final Project Plans <br />Final construction plans will be prepared indicating the project locations <br />and plan view sheets for the areas to be milled and overlaid. Surveyed <br />topographic information will be used to prepare the construction plans. <br />Base drawing information will include GSOC design locates, curb <br />inspection, city parcel map information and record plans. <br />
The URL can be used to link to this page
Your browser does not support the video tag.