My WebLink
|
Help
|
About
|
Sign Out
Home
Search
20231025 Environmental Board Packet Combined
LinoLakes
>
Advisory Boards & Commissions
>
Environmental Board
>
Packets
>
2023
>
20231025 Environmental Board Packet Combined
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2023 10:21:30 AM
Creation date
10/20/2023 1:51:20 PM
Metadata
Fields
Template:
Environmental Board
Env Bd Document Type
Env Bd Packet
Meeting Date
10/25/2023
Env Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> <br />ENVIRONMENTAL BOARD <br />ITEM 6A <br /> <br />STAFF ORIGINATOR: Andy Nelson, Environmental Coordinator <br /> <br />DATE: October 25th, 2023 <br /> <br />REQUEST: Natures Refuge North Concept Plan Review <br /> <br />APPLICANT: M/I Homes of Minneapolis/St. Paul, LLC <br /> 5354 Parkdale Drive, Suite 100 <br /> St. Louis Park, MN 55416 <br /> <br />OWNER: KCR Investments <br /> 35209 Sand Pointe Dr. <br /> Corsslake, MN 56442 <br /> <br /> <br />BACKGROUND <br /> <br />The applicant has submitted a land use application for a Concept Plan for a Planned Unit <br />Development for Natures Refuge North. This project would be an expansion of the <br />Natures Refuge project that is currently under construction on Main Street (CSAH 14) <br />just west of Lino Lakes Elementary School (725 Main Street). <br /> <br />Per the applicant’s narrative, the proposed plan includes 108 single-family residential lots <br />on the approximately 59.3 acres site. The Planned Unit Development (PUD) request is to <br />allow for a variety of housing unit types and lot sizes. Approximately 30 acres of open <br />space will be provided under the proposed design. PUD flexibility may be provided if a <br />project provides public benefits. <br /> <br />This staff report is based on a review of the following documents: <br /> <br />• Concept Plan prepared by Carlson McCain, dated 8-28-23 <br />• Resource Inventory Exhibit, prepared by Carlson McCain, dated 10-11-23 <br />• Wetland Delineation Report prepared by Kjolhaug Environmental Services <br />Company, Inc., dated 10-14-23 <br />• Wetland Buffer Exhibit prepared by Carlson McCain, dated 10-03-23 <br />• Environmental Assessment Worksheet, January 8th, 2007. <br /> <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.