My WebLink
|
Help
|
About
|
Sign Out
Home
Search
12-04-2023 Council Work Session Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2023
>
Searchable Packets
>
12-04-2023 Council Work Session Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2023 10:52:33 AM
Creation date
12/8/2023 10:30:53 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
12/04/2023
Council Meeting Type
Work Session Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
355
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(Amcon 11/13/2023) Understood, Civil drawings will be provided for the full Site & <br />Building Plan Submittal after this Concept Submittal approval. <br />(WSB 11/29/2023) To be reviewed at the time of full submittal <br />2.The applicant shall note that site grading work shall be done in accordance with the <br />approved MPCA Response Action Plan (RAP) and Contingency Construction Plan <br />(CCP). Provide updated documentation regarding the current state of the RAP. <br />(Amcon 11/13/2023) A copy of the RAP & CCP document, dated Aug. 27, 2018 is <br />included for your review. The owner did have the site cleaned up, please refer to City <br />of Lino Lakes Permit #2021-02485. Junk & debris that had been dumped on the site <br />was removed & existing concrete debris was properly recycled. <br />•Stormwater Management <br />The stormwater management for Lino Lakes Tech Center consists of a pond expansion on <br />the west side of the parcel. <br />Comments: <br />1.The applicant shall provide an updated Stormwater Management Report <br />demonstrating the appropriate sizing and treatment for the expansion. <br />(Amcon 11/13/2023) Understood, Civil drawings will be provided for the full Site & <br />Building Plan Submittal after this Concept Submittal approval. <br />(WSB 11/29/2023) To be reviewed at the time of full submittal <br />•Water Supply <br />Utilities are not proposed or shown for the site. The applicant will be required to extend <br />water from the adjacent site. <br />Comments: <br />1.Applicant to provide a utility plan for the site meeting City requirements. <br />(Amcon 11/13/2023) Understood, Civil drawings will be provided for the full Site & <br />Building Plan Submittal after this Concept Submittal approval. <br />(WSB 11/29/2023) To be reviewed at the time of full submittal <br />2.We recommend that the City Deputy Director of Public Safety-Fire Division review the <br />proposed plan when submitted <br />(Amcon 11/13/2023) Understood. <br />(WSB 11/29/2023) To be reviewed at the time of full submittal <br />•Sanitary Sewer <br />Utilities are not proposed or shown for the site. Sanitary sewer maybe required <br />depending on use. <br />(Amcon 11/13/2023) Understood, Civil drawings will be provided for the full Site & Building <br />Plan Submittal after this Concept Submittal approval. <br />(WSB 11/29/2023) Based on the proposed use of bathrooms, sanitary sewer will be <br />required to be extended along Lake Drive to the site <br />•Transportation <br />113
The URL can be used to link to this page
Your browser does not support the video tag.