Laserfiche WebLink
Lino Lakes Tech Center proposes connecting to the existing storage site to the north for <br />access off of Park Court with paved private access to each of the units throughout the <br />site. The 2003 EAW analyzed this parcel as a light industrial user with two (2) <br />professional office buildings totally 28,800 sf. The existing mini self-storage facility <br />together with the Tech Center will produce less traffic than two professional office <br />buildings and therefore, is consistent with the EAW findings. No adverse traffic impacts <br />are anticipated and a traffic study is not required. <br />There should be no site access off of Lake Drive per Anoka County Access Policy. <br />Comments: <br />1.Vehicle access through the existing storage facility is a concern. We recommend <br />additional evaluation. <br />(Amcon 11/13/2023) No site access from Lake Drive is allowed per Anoka County <br />Access Policy (WSB review, dated 7/5/23), so this property is landlocked. The only <br />access is through the existing storage buildings/ phase I entrance from Park Court. <br />(WSB 11/29/2023) Fire vehicle turning movements provided. Turning movements for <br />delivery and garbage vehicle exhibits will need to be provided with full submittal. <br />Access details for the site owners and users utilizing the current secure storage <br />access should be provided with full submittal. <br />2.The applicant shall provide a pavement removal/replacement and site plans <br />(Amcon 11/13/2023) Understood, Civil drawings will be provided for the full Site & <br />Building Plan Submittal after this Concept Submittal approval. <br />(WSB 11/29/2023) To be reviewed at the time of full submittal <br />3.The applicant shall note if curb & gutter will be used <br />(Amcon 11/13/2023) Incomplete sentence from WSB review, dated 7/5/23. Curb & <br />gutter is shown in the proposed site plan. <br />(WSB 11/29/2023) Label curb and gutter style and identify areas of tipout curb with <br />full submittal <br />•Wetlands and Mitigation Plan <br />Wetlands are shown on the existing survey for the site. <br />Comments: <br />1.The existing wetland is not in the Wetland Mapping Corridor (WMC) <br />a.Show and call out the required minimum 10' wetland buffer size. <br />(Amcon 11/13/2023) Understood, Civil drawings will be provided for the full Site & <br />Building Plan Submittal after this Concept Submittal approval. <br />(WSB 11/29/2023) To be reviewed at the time of full submittal <br />•Landscaping <br />Landscaping plans were not provided as part of the submittal. The City’s Environmental <br />Coordinator to review landscaping and provide in-depth comments when provided <br />(Amcon 11/13/2023) Understood, Civil & Landscape drawings will be provided for the full <br />Site & Building Plan Submittal after this Concept Submittal approval. <br />(WSB 11/29/2023) To be reviewed at the time of full submittal <br />•Floodplain <br />114