Laserfiche WebLink
3.Building Setbacks (street and side) <br />4.Garage sizes < 520sf <br />5.Garage forward of house <br />6.Length of garage wall > 50% structure facade <br />Next Steps <br />If the applicant decides to move forward with the project: <br />1.The applicant will hold a neighborhood meeting (if required by the Council). <br />2.The applicant will submit a land use application. <br />3.A public hearing notice will be posted in the newspaper and mailed to residents. <br />4.A public hearing will be held by the Planning & Zoning Board. The Board will make <br />recommendation to the City Council. <br />5.The City Council will make the final decision. <br />The date of the neighborhood meeting will be determined by the applicant. The dates of the <br />City meetings will be determined based on when a complete land use application is submitted. <br />REQUESTED COUNCIL DIRECTION <br />Staff is requesting feedback from the City Council: <br />1.Are there other Benefits Gained or Flexibility Provided? <br />2.Thoughts on PUD flexibility for lot widths, lot sizes, setbacks and building & garage <br />design standards? <br />3.Should the applicant be required to hold a neighborhood meeting prior to PUD <br />Preliminary Plan/Preliminary Plat submittal? <br />ATTACHMENTS <br />1.Site Location and Aerial Map <br />2.Applicant Narrative <br />3.Concept Plan with Aerial <br />4.Concept Plan with Wetland Buffers and Lot Sizes <br />5.2006 Concept Plan-Traditional vs Conservation Subdivision <br />6.Yield Plan <br />7.House Plans <br />8.City Engineer Memo dated November 1, 2023 <br />9.Environmental Coordinator Memo dated October 30, 2023 <br />10.Park Board Memo dated November 2, 2023 <br />43