|
Names and addresses of the record owner , developer , land surveyor ,
<br /> engineer , designer of the plat , and any agents , contractors , and subcontractors who will
<br /> be responsible for project implementation , including the name , address and phone
<br /> number of the party responsible for maintenance of all erosion and sediment control
<br /> measures ;
<br /> kokOLTabulation of construction implementation schedule , including : estimated
<br /> start date , time frames , and schedules for each construction phase , and completion
<br /> date ;
<br /> kf)Leh. Coples of permits or permit applications required by any other government
<br /> entity or agencies including mitigation measures required as a result of any review for
<br /> the project ( e . g . , wetland mitigation , EAW , EIS , archaeology survey ) ;
<br /> (g4ff). Exlsting conditions map . An existing topographic site map , drawn to a
<br /> legible scale and clearly labeled with a north arrow and date of preparation . The plan ,
<br /> based on a certificate of survey , shall include the following information :
<br /> 1 . Property lines and lot dimensions ;
<br /> 2 . Existing zoning classifications for land within and abutting the
<br /> development , including shoreland , floodway , floodway fringe , or general floodplain , and
<br /> other natural resource overlay districts ;
<br /> 3 . All buildings and outdoor uses including all dimensions and setbacks ;
<br /> 4 . All public and private roads , interior roads , driveways and parking lots ;
<br /> 5 . Show ordinary high � Vag-, -water levels of all navigable waters , 100
<br /> year critical flood duration event elevations , and delineated wetland boundaries , if any .
<br /> If not available , appropriate flood zone determination or wetland delineation , or both ,
<br /> may be required at the applicant ' s expense ;
<br /> 6 . Identify all special waters and impaired waters , as identified in the most
<br /> recent listing by the MPCA , within one mile of the project that receive runoff from the
<br /> project ;
<br /> 7 . Location of drainage areas , existing storm sewer facilities , including pipes ,
<br /> manholes , catch basins , ponds , swales and drainage channels within 100 feet of the
<br /> subject property . Existing pipe sizes , grades , rim and invert elevations , and normal and
<br /> high water elevations must be included ;
<br /> 8 . Existing contours at one foot intervals , shown as dashed lines for the
<br /> subject property and extending 100 feet beyond the outside boundary of the proposed
<br /> plat ;
<br /> 9 . Location of any Ssteep slopes where areas have an average slope of
<br /> more than 12 % over a distance of at least 50 feet , or bluff areas as defined in the
<br /> wherela-ndShoreland ordinance , whichever is applicable ; and
<br /> 10 . Location of Wwooded areas , high quality native plant communities , or
<br /> other officially designated natural resource areas .
<br /> NLg). Proposed conditions map .
<br /> 13
<br />
|